Tender Details
Particulars | Details |
---|---|
Title |
Selection Of Authoritys Engineer (Ae) For Supervision Of Construction Of Shohratgarh Bypass (Design Length 6.273 Km) To Two Lane With Paved Shoulder On Nh 730 (Starts Near Ch. 413.700 And Ends Near Ch. 419.000) Under Epc Mode In The State Of U.P.
|
Description |
Selection Of Authoritys Engineer (Ae) For Supervision Of Construction Of Shohratgarh Bypass (Design Length 6.273 Km) To Two Lane With Paved Shoulder On Nh 730 (Starts Near Ch. 413.700 And Ends Near Ch. 419.000) Under Epc Mode In The State Of U.P.
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_MoRTH_768448_1 |
Reference Number |
1346/8 Com-NH Circle/23 dt 22.08.23 |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | 0 |
Place | SE NH CIRCLE PWD GORAKHPUR |
Link | https://eprocure.gov.in |
Start Date | August 25, 2023 15:30 |
End Date |
05/10/2023 ( Expired 596 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.
Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreIndependent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Read moreConstruction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreof your Industry type