Selection of AUTHORITYS Engineer (AE) for Supervision of Construction of Shohratgarh Bypass (Design Length 6.273 Km) to two lane with paved shoulder on NH-730 (starts near ch. 413.700 and ends near ch. 419.000) under EPC mode in the State of U.P.
Central Public Procurement Portal 1 · SE NH CIRCLE PWD GORAKHPUR
- Tender value
- ₹0
- EMD
- ₹0
- Tender fee
- ₹5,000
This tender closed on 05 Oct 2023. 10 tenders like it are open now.
Open tenders like this
-
Construction of Two-lane Bypass with Paved Shoulders for Sadri Town.
PWD - CE AND AS | ACE - JODHPUR | SE-PALI | EE-SOJAT · Rajasthan Closes 27 Nov 2026
View tender -
Construction of Alirajpur Bypass (2-Lane with Paved Shoulder) from Ch. 0.000 to Ch. 11.792 in the State of Madhya Pradesh (Total Length-11.792 Kms) under EPC Mode
Madhya Pradesh Road Development Corporation Limited · Madhya Pradesh Closes 30 Nov 2026
View tender -
Consultancy Services for Preparation of DPR for i Widening Upgradation to Two Lane with Paved Shoulder on NH 169A from Km. 30.75 to Km. 51.60 Agumbe Ghat, ii Construction of Two Lane with Paved Shoulder for Thirtahalli Bypass starts on from NH169A
Ministry of Road Transport and Highways | P6 Delhi - MoRTH | RO Bangalore - MoRTH · Karnataka Closes 27 Nov 2026
View tender -
4L of Jagtial Karimnagar Section of NH 563 from Jagtial Bypass Start at Design Ch.0.000 Existing chainage 90.500 on NH63 to Design Ch.58.866 km near SH-1 Ch. 170.400 km at Karimnagar Bypass End DL 58.866 km in the state of Telangana on DBFOT mode
National Highways Authority of India | Head Office - NHAI | Technical - NHAI · Delhi Closes 30 Dec 2026
View tender
Tender details
- Tender ID
- 2023_MoRTH_768448_1
- Reference number
- 1346/8 Com-NH Circle/23 dt 22.08.23
- Organisation
- Central Public Procurement Portal 1
- Location
- SE NH CIRCLE PWD GORAKHPUR
- Bids open
- 25 Aug 2023, 10:00 AM
- Bids close
- 5 Oct 2023, 11:00 AM
- Tender value
- ₹0
- EMD
- ₹0
- Tender fee
- ₹5,000
Source: https://eprocure.gov.in
Bid on the next selection of AUTHORITYS Engineer tender
Most bids fail on paperwork. Before the next one opens, we'll check your eligibility and get your registrations, digital signature (DSC) and documents ready.
More tenders like this
-
IE Services for 4Laning of Jagtial-Karimnagar Section of NH-563 from Jagtial Bypass Start at Design Ch.0.000 (Ex.chainage 90-500 on NH-63) to Design Ch.58.866 km (Ch.170.400 km) at Karimnagar Bypass End (58.866 km) to be executed on BOT mode NH O
National Highways Authority of India | Head Office - NHAI | Technical - NHAI · Delhi Closes 3 Dec 2026
View tender -
Widening and Strengthening of Puwayan-Nigohi-Tilhar- Jaitipur-Dataganj- Badaun Road (SH-126) Ch.-48.600 to 71.567 and Ch. 76.567 to 83.567 with Paved Shoulder In Distt Shahjahanpur (Fin Year 2026-27)
Cheif Engineer Bareilly Zone PWD Bareilly | SE BAREILLY CIRCLE PWD BAREILLY | EE CONSTRUCTION DIVISION-1 PWD SHAHJAHANPUR · Uttar Pradesh Closes 27 Nov 2026
View tender -
Widening and Strengthening of Jalalabad Shamsabad Mohammadabad Saurikh Bidhuna Road (SH-163) Ch.-7.000 to 21.000 with Paved Shoulder In Distt Shahjahanpur (Fin Year 2026-27)
Cheif Engineer Bareilly Zone PWD Bareilly | SE BAREILLY CIRCLE PWD BAREILLY | EE CONSTRUCTION DIVISION-1 PWD SHAHJAHANPUR · Uttar Pradesh Closes 27 Nov 2026
View tender -
Construction of 4 Lane with Paved Shoulder Daudnagar Bypass from km 93.915 To km 102.290 of NH 139 on Naubatpur Hariharganj Road in the State of Bihar on EPC mode.
Ministry of Road Transport and Highways Closes 27 Nov 2026
View tender -
Construction of the Lonar Bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on NH 548C in the State of Maharashtra on EPC Mode
Construction of the LonarBypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on NH 548C in the State of Maharashtra on EPC Mode
Ministry of Road Transport and Highways | P6 Delhi - MoRTH | RO Mumbai - MoRTH | NH Division-Akola - MoRTH · Maharashtra Closes 16 Dec 2026
View tender -
RFP For Construction of Gonda Bypass (western part) of NH 330B to four lane with paved shoulder configuration design length of 20.570 Km under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh
Ministry of Road Transport and Highways | P2 Delhi - MoRTH | RO Lucknow - MoRTH Closes 30 Nov 2026
View tender