🏗️ Bid Invitation: Pipeline Recovery Services 🛠️ South Eastern Coalfields Limited (Secl), A Public Sector Undertaking, Is Seeking Bids From Experienced Service Providers For The Recovery Of Old/Used Pipelines From Quarry Sumps At Lower Kusmunda 1 (Lk 1), Lower Kusmunda 2 (Lk 2 East), Lower Kusmunda 2 (Lk 2 West), And Old Dipka For A Duration Of 180 Days On An As Needed Basis. 📅 Bid Submission Deadline: May 04, 2024, 5:00 Pm Earnest Money Deposit (Emd): Inr 17,900 Interested Bidders Must Submit Detailed Proposals, Including Methodology, Safety Protocols, And Cost Estimates, For The Successful Execution Of This Project At The Dipka Expansion Project, Dipka Area. Keywords: Pipeline Recovery, Secl, Coalfields, Public Sector Undertaking, Dipka Expansion Project, Bid, Tender, Emd, Procurement
Particulars Details
Title
Recovery Of Old/ Used Pipelines From Different Locations Of Quarry Sumps Of Lower Kusmunda 1 (Lk 1), Lower Kusmunda 2 (Lk 2 East), Lower Kusmunda 2 (Lk 2 West) And Old Dipka For A Period Of 180 Days On As And When Required Basis At Dep.
Description
Recovery Of Old/ Used Pipelines From Different Locations Of Quarry Sumps Of Lower Kusmunda 1 (Lk 1), Lower Kusmunda 2 (Lk 2 East), Lower Kusmunda 2 (Lk 2 West) And Old Dipka For A Period Of 180 Days On As And When Required Basis At Dep.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_306833_1
Reference
Number
SECL/GM/DA/SO(EnM)/ e-tender/24-25/09 dtd-20/04/24
Tender Fee 0
EMD 17900
Tender Value
Place Dipka Expansion Project, Dipka Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=317959
Start Date April 23, 2024 15:30
End Date

04/05/2024 ( Expired 373 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days

Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days

Read more
Empanelment with rate contract for hiring of different category of a.c./ non a.c. vehicles on as and when required basis for wcl hq, deployed under outstation duty for a period of two years (2x365 days.)

Empanelment with rate contract for hiring of different category of &#x0d a.c./ non a.c. vehicles on as and when required basis for wcl hq, &#x0d deployed under outstation duty for a period of two years (2x365 &#x0d days.)

Read more
Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.

Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.

Read more
Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days

Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days

Read more
Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Read more
Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.

Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.

Read more
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-1 (lk-1) quarry sump on as and when required basis for a period of one year.

Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-1 (lk-1) quarry sump on as and when required basis for a period of one year.

Read more
Repairing of different submersible pumps on as and when required basis for the period of 1 year at sayald project

Repairing of different submersible pumps on as and when required basis for the period of 1 year at sayald project

Read more
Repairing of 8 submersible pumps for a period of 1 year on as and when required basis under urimari ocp.

Repairing of 8 submersible pumps for a period of 1 year on as and when required basis&#x0d installed at different locations&#x0d under urimari ocp.

Read more
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-2 quarry sump on as and when required basis for a period of one year at dep.

Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at lower kusmunda-2 quarry sump on as and when required basis for a period of one year at dep.