Tender Details
Particulars | Details |
---|---|
Title |
Construction Work Of Lane By C.C. And Laying Of Water Drainage Pipe From H.No 100/157 To 100/143, 100/137 And 100/480 Under Ward 97 Zone 4.
|
Description |
Construction Work Of Lane By C.C. And Laying Of Water Drainage Pipe From H.No 100/157 To 100/143, 100/137 And 100/480 Under Ward 97 Zone 4.
|
Organisation | Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT |
Tender Id | 2025_NNKAN_990367_1 |
Reference Number |
415/A.A-4/24-25 |
Tender Fee | 1180 |
EMD | 2 Lakh |
Tender Value | |
Place | ward-97 |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1748473 |
Start Date | January 04, 2025 23:30 |
End Date |
08/01/2025 ( Expired 147 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreAbilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreConstruction of boundary wall, pathway, gajibo fountain and other necessary work in the nilkanth colony garden under ward no. 07 zone no.01.
Construction of boundary wall, pathway, gajibo fountain and other necessary work in the nilkanth colony garden under ward no. 07 zone no.01.
Read more(nigam nidhi) construction of cc road and drain work form vajpai ji resedance to komal dingh residence zone no. 02 ward no. 10 file no. 133/25x3/6.
(nigam nidhi) construction of cc road and drain work form vajpai ji resedance to komal dingh residence zone no. 02 ward no. 10 file no. 133/25x3/6.
Read moreChief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Read moreConstruction of drain near coal mines from isai mohalla to kripal chowk main road at giriraj kishor kapoor ward under zone no. 3.
Construction of drain near coal mines from isai mohalla to kripal chowk main road at giriraj kishor kapoor ward under zone no. 3.
Read moreProviding and laying of hdpe pipe line at ward 03 and 05 from bypass road boi to tarapur bypass road
Providing and laying of hdpe pipe line at ward 03 and 05 from bypass road boi to tarapur bypass road
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreof your Industry type