Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Laying And Di Of 3 Range X 390m Of 8 And 10 Inch Dia. Pipeline With All Electrical Accessories For Multiple Shifting Of Pump Motor For A Period Of 12 Months Running For Dewatering At Quarry No. 03 Under Ktc.
|
Description |
Dismantling, Laying And Di Of 3 Range X 390m Of 8 And 10 Inch Dia. Pipeline With All Electrical Accessories For Multiple Shifting Of Pump Motor For A Period Of 12 Months Running For Dewatering At Quarry No. 03 Under Ktc.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_332576_1 |
Reference Number |
KTC/PE (EnM)/E-Tender/24-25/230, dated-13.03.2025 |
Tender Fee | 0 |
EMD | 29100 |
Tender Value | |
Place | P.E. (EnM), Office of the PO, Kathara Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344765 |
Start Date | March 15, 2025 21:30 |
End Date |
24/03/2025 ( Expired 48 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, laying and joining of 8 diameter and 6 diameter pipeline with accessories like flange welding, rubber ion ,bend ,sluice valve and nrv etc for dewatering of different quarry for monsoon preparation 2025-26 of govindpur ph-ii ocp
Dismantling, laying and joining of 8 diameter and 6 diameter pipeline with accessories like flange welding, rubber ion ,bend ,sluice valve and nrv etc for dewatering of different quarry for monsoon preparation 2025-26 of govindpur ph-ii ocp
Read moreEstimate for construction of 03 nos. sump well and laying di pipeline for dewatering the flood water into outfall channel rd. 90000 of gurgoan canal from village-hassanpur
Estimate for construction of 03 nos. sump well and laying di pipeline for dewatering the flood water into outfall channel rd. 90000 of gurgoan canal from village-hassanpur
Read moreLaying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area
Laying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area
Read moreDismantling of total electrical installation cables, panels, fire system in ground floor store room, offices, toilet, canteen ic shifting of all dismantling materials for proposed rent out space for gnb motor at cossipore te ctd.
Dismantling of total electrical installation cables, panels, fire system in ground floor store room, offices, toilet, canteen ic shifting of all dismantling materials for proposed rent out space for gnb motor at cossipore te ctd..
Read moreDismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Read moreMaking of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.
Making of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.
Read moreInstallation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 75 days at bazari more under s.b. project.
Installation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 75 days at bazari more under s.b. project.
Read moreLaying of 6 inch(150mm) diameter pipeline (approx 400m) for mine dewatering at new patch of potanga quarry under urimari ocp.
Laying of 6 inch(150mm) diameter pipeline (approx 400m) for mine dewatering at new patch of potanga quarry under urimari ocp.
Read moreLaying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.
Laying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.
Read moreInstallation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, dismantling of ms pipes and other miscellaneous work for the purpose of dewatering, firefighting as per requirement.
Installation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, dismantling of ms pipes and other miscellaneous work for the purpose of dewatering, firefighting as per requirement.
Read moreof your Industry type