Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repairing, Maintenance Dismantling Laying And Di Of 02 Range 8 Diameter Pipeline For A Period Of 12 Months Running For Dewatering Of Quarry No 02 Under Kathara Colliery.
|
Description |
Repairing, Maintenance Dismantling Laying And Di Of 02 Range 8 Diameter Pipeline For A Period Of 12 Months Running For Dewatering Of Quarry No 02 Under Kathara Colliery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_325382_1 |
Reference Number |
KTC/PE/EnM/24-25/187 Date-09.01.2025 |
Tender Fee | 0 |
EMD | 14200 |
Tender Value | |
Place | P.E. (EnM), Office of the PO, Kathara Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337283 |
Start Date | January 11, 2025 15:30 |
End Date |
21/01/2025 ( Expired 168 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.
Providing and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.
Read moreOperation and maintenance of sewage treatment plant of 6.50 mld capacity (mbbr technology) at budhlada for 12 months period 01.04.2025 to 31.03.2026
Operation and maintenance of sewage treatment plant of 6.50 mld capacity (mbbr technology) at budhlada for 12 months period 01.04.2025 to 31.03.2026
Read moreNiet no. - 14 of the fy 2025-2026 of the ee/bqa, phe dte. (sl. no. 02)
Day to day operation and maintenance of distribution system and rising main pipeline (di/ci/upvc/hdpe) for tubewell with connecting line, stand post, fhtc and operation of sluice valve of 16 nos. svs (dharisayar, barujdanga, digra, hajipur,
Read moreContract for operation, maintenance and running of 30.0 kld sewage treatment plant (stp) at rtps, dvc for a period of 09 (nine) months.
Contract for operation, maintenance and running of 30.0 kld sewage treatment plant (stp) at rtps, dvc for a period of 09 (nine) months.
Read moreSpecial repair of 02 nos. link road group no.05 market committee ferozepur city, distt. ferozepur including 5 year maintenance 1 year defect liability period plus 4 year maintenance period under repair programme year 2022-23 2023-24 and 2024-25.
Special repair of 02 nos. link road group no.05 market committee ferozepur city, distt. ferozepur including 5 year maintenance 1 year defect liability period plus 4 year maintenance period under repair programme year 2022-23 2023-24 and 2024-25.
Read moreProviding assistance for establishment work / typing / maintenance of record and stores and other miscellaneous works under marine engineering division for a period 02 (two) years.
Providing assistance for establishment work / typing / maintenance of record and stores and other miscellaneous works under marine engineering division for a period 02 (two) years.
Read moreRunning and maintenance of existing 02 nos over head steel press tank inside police line tank compound by dismantling and re-crecting the tank in the existing location, 01 no over head steel pressed tank at sainik vishram ghar,near.........
Running and maintenance of existing 02 nos over head steel press tank inside police line tank compound by dismantling and re-crecting the tank in the existing location, 01 no over head steel pressed tank at sainik vishram ghar,near.........
Read moreLaying, fitting, dismantling of different sizes of pipeline and perforated pipeline as and when required basis and operation of fog canon, er system and sprinkler system at siding 1,2,3, 4 of bhubaneswari ocp for a period of one year
Laying, fitting, dismantling of different sizes of pipeline and perforated pipeline as and when required basis and operation of fog canon, er system and sprinkler system at siding 1,2,3, 4 of bhubaneswari ocp for a period of one year
Read moreNiet no. - 02 of the fy 2025-2026 of the ae/bsd, phe dte. (sl.no-15)
Laying fitting fixing of different dia sluice valve, construction of sluice valve chamber, laying hdpe / upvc pipe and other allied works for major repairing of damageds
Read moreSelection of agency to build-operate transfer of 12 kld faecal sludge treatment plant fstp based on planted drying bed technology along with operations and maintenance o and m for 5 years defect liability period for 2 years under rangkang gp of amar
Selection of agency to build-operate transfer of 12 kld faecal sludge treatment plant fstp based on planted drying bed technology along with operations and maintenance o and m for 5 years defect liability period for 2 years under rangkang gp of amar
Read moreof your Industry type