Tender Details
Particulars | Details |
---|---|
Title |
Dismantling And Laying Of 800m Of 8 Inch Diameter Pipeline At Quarry No. 03 For Shifting Of Pump And 120m Pipe Line Diversion For Pump Runnig For Dewatering At Quarry No. 03 Of Kathara Colliery
|
Description |
Dismantling And Laying Of 800m Of 8 Inch Diameter Pipeline At Quarry No. 03 For Shifting Of Pump And 120m Pipe Line Diversion For Pump Runnig For Dewatering At Quarry No. 03 Of Kathara Colliery
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_CCL_288082_1 |
Reference Number |
KTC/PE(EnM)/E-Tender/23-24/83 |
Tender Fee | |
EMD | 9200 |
Tender Value | |
Place | Office of the Project Officer, PE (EnM), Kathara C |
Link | https://coalindiatenders.nic.in |
Start Date | September 07, 2023 15:30 |
End Date |
15/09/2023 ( Expired 611 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying of 8 inch steel gas pipeline by hdd method for crossing of brahmani river and associated works at rourkela ga cgd project of gail gas limited
Laying of 8 inch steel gas pipeline by hdd method for crossing of brahmani river and associated works at rourkela ga cgd project of gail gas limited
Read moreShifting of pipeline from new road alignment by pmgsy at nh208a (ananda bazar) to dt road of jubarajnagar block of dws sub-division panisagar 2024-25/sh- laying of upvc pipe line and other allied works attached to dtw/innovative schemes (2nd call)
Shifting of pipeline from new road alignment by pmgsy at nh208a (ananda bazar) to dt road of jubarajnagar block of dws sub-division panisagar 2024-25/sh- laying of upvc pipe line and other allied works attached to dtw/innovative schemes (2nd call)
Read more11 kv cable laying works for new cta sub-station power connection, providing hume pipe and 11 kv cable laying near lions club, digboi and shifting of 11 kv cable from nazirating switch board to township switch board at tinali sub-station for aod.
11 kv cable laying works for new cta sub-station power connection, providing hume pipe and 11 kv cable laying near lions club, digboi and shifting of 11 kv cable from nazirating switch board to township switch board at tinali sub-station for aod.
Read moreLaying of 8 inches additional pipe range at new eastern side sump for continuous dewatering sump water in order to extract ob/coal from 3rd-4th seam under jocp under hzb area
Laying of 8 inches additional pipe range at new eastern side sump for continuous dewatering sump water in order to extract ob/coal from 3rd-4th seam under jocp under hzb area
Read more8-inch pipeline work in qry-1 extension mines of rajhara colliery for the installation of pumps for mine dewatering of mines under monsoon activity of 2025
8-inch pipeline work in qry-1 extension mines of rajhara colliery for the installation of pumps for mine dewatering of mines under monsoon activity of 2025
Read moreDrilling of 03 nos. 8 inch (eight inch) dia borehole for dewatering of mine water at shiwani ug mine under bhatgaon area
Drilling of 03 nos. 8 inch (eight inch) dia borehole for dewatering of mine water at shiwani ug mine under bhatgaon area
Read moreLabour charges for dismantling and relaying of 6 and 8 dia. pipe line in quarry for dewatering of water (hdpe, ms) at ikocp for the year 2025-26 in srirampur area, mancherial (dist), t.s.
Labour charges for dismantling and relaying of 6 and 8 dia. pipe line in quarry for dewatering of water (hdpe, ms) at ikocp for the year 2025-26 in srirampur area, mancherial (dist), t.s.
Read moreUws scheme at udp/sh-re-modeling and laying of drinkng water pipe line at debipara, near amarsgar bank, undr dws sd no-i, udp, gomati, tripura 2024-25.
Uws scheme at udp/sh-re-modeling and laying of drinkng water pipe line at debipara, near amarsgar bank, undr dws sd no-i, udp, gomati, tripura 2024-25.
Read moreRepairing of leakages, dismantling of damaged pipelines and laying of fresh/new pipes on as and when required basis with own arrangement of dg/service van and cutting for delivery ranges of pump installed at bkb old sump and quarry 2 under ask oc
Repairing of leakages, dismantling of damaged pipelines and laying of fresh/new pipes on as and when required basis with own arrangement of dg/service van and cutting for delivery ranges of pump installed at bkb old sump and quarry 2 under ask oc
Read moreErection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Erection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera
Read moreof your Industry type