Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Upgradation And Construction Work For Nasirabad Sarwar Kekri Road (Sh 26 From 2 Lane To 4 Lane (Phase Ii) In The State Of Rajasthan On Engineering Procurement And Construction (Epc) (Total Design Length 48.419 Km)
|
| Description |
Upgradation And Construction Work For Nasirabad Sarwar Kekri Road (Sh 26 From 2 Lane To 4 Lane (Phase Ii) In The State Of Rajasthan On Engineering Procurement And Construction (Epc) (Total Design Length 48.419 Km)
|
| Organisation | RSRDCC-GM |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 11800 |
| EMD | 7.5 Crore |
| Tender Value | 375.23 Crore |
| Place | Rajasthan |
| Link | Login to view |
| Start Date | September 11, 2026 14:30 |
| End Date |
Open
22/10/2026
10 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreConstruction of 4-lane flyover along with approaches and service roads at simrahi bazar from design ch. 170.210 km to ch. 172.250 km on nh27 (total length 2.04 km.) in the state of bihar on epc mode.
Construction of 4-lane flyover along with approaches and service roads at simrahi bazar from design ch. 170.210 km to ch. 172.250 km on nh27 (total length 2.04 km.) in the state of bihar on epc mode.
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConstruction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 75.150 of new nh38 and ending at design km 88.030 of new nh38 (design length 22.710km) in the state of tamil nadu on epc mode
Construction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 75.150 of new nh38 and ending at design km 88.030 of new nh38 (design length 22.710km) in the state of tamil nadu on epc mode
Read moreUpgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Read moreUpgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Upgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Read moreConstruction of 6 lane flyover at tuljapur junction at km 2.950 on tuljapur-ausa section of nh361 with additional service road towards tuljapur city of length of 1.265 km (total length 2.455 km) for rectification of accident spot on epc mode
Construction of 6 lane flyover at tuljapur junction at km 2.950 on tuljapur-ausa section of nh361 with additional service road towards tuljapur city of length of 1.265 km (total length 2.455 km) for rectification of accident spot on epc mode
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreUpgradation of jabalpur purena (4 lane) road length 9.00 km. including electrification work. under sub-division no-1 jabalpur.
Upgradation of jabalpur purena (4 lane) road length 9.00 km. including electrification work. under sub-division no-1 jabalpur.
Read moreof your Industry type