Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Service Road On Both Side Of 4 Lane Varanasi Bypass From Km 0.00 (Ing Point At Km 271.300 Of Nh 56) To Km 15.250 (End Point At Km 11.170 Of Nh 29) In The State Of Uttar Pradesh On Epc Mode
|
| Description |
Construction Of Service Road On Both Side Of 4 Lane Varanasi Bypass From Km 0.00 (Ing Point At Km 271.300 Of Nh 56) To Km 15.250 (End Point At Km 11.170 Of Nh 29) In The State Of Uttar Pradesh On Epc Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_244434_1 |
|
Reference Number |
NHAI/HQ/UP(E)/Varanasi bypass/NH-56/E-tender |
| Tender Fee | 10000 |
| EMD | 98 Lakh |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=279307 |
| Start Date | August 07, 2025 23:25 |
| End Date |
Expired
28/10/2025
Expired 352 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreConstruction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Read moreConstruction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode under nh o annual plan 2023 24
Construction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode under nh o annual plan 2023 24
Read moreConstruction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
Construction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
Read moreAuthority engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km on epc mode
Authority engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km on epc mode
Read moreConstruction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Construction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Read moreConstruction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Read moreStmc work on nh-56 old nh-113, pratapgarh-padi section and construction of 2 lane road in forest area, km 38/100-43/040, 46/500-47/080 and 51/640-54/500, nh-113 on epc mode, rajasthan
Stmc work on nh-56 old nh-113, pratapgarh-padi section and construction of 2 lane road in forest area, km 38/100-43/040, 46/500-47/080 and 51/640-54/500, nh-113 on epc mode, rajasthan
Read moreof your Industry type