Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Service Road Along With 02 Flyovers Underpasses At Ch. 85.750 To 97.250 On Guna Bypass Section Of Nh 46 In The State Of Madhya Pradesh On Epc Mode
|
| Description |
Construction Of Service Road Along With 02 Flyovers Underpasses At Ch. 85.750 To 97.250 On Guna Bypass Section Of Nh 46 In The State Of Madhya Pradesh On Epc Mode
|
| Organisation | National Highways Authority of India | Head Office - NHAI | Technical - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 20000 |
| EMD | 1.34 Crore |
| Tender Value | 133.63 Crore |
| Place | |
| Link | Login to view |
| Start Date | September 22, 2026 23:50 |
| End Date |
Open
09/11/2026
27 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Read moreConstruction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.
Construction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.
Read moreConstruction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Read moreConstruction of service road from ch 312.750 to 314.800 lhs and from ch 313.000 to 314.800 rhs near urla village on existing durg bypass nh-53 (old nh-06) in the state of chhattisgarh on engineering procurement and construction (epc) mode.
Construction of service road from ch 312.750 to 314.800 lhs and from ch 313.000 to 314.800 rhs near urla village on existing durg bypass nh-53 (old nh-06) in the state of chhattisgarh on engineering procurement and construction (epc) mode.
Read moreIe services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o
Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConstruction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read moreLandslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Landslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Read moreof your Industry type