Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvement Work For Provision Of 11 Kv Linkline For The Purpose Of Load Bifurcation From Existing 11 Kv Keezhkulam And Dhanakarkulam Feeders In Respect Of Avaraikulam Section Under Vallioor Division In Respect Of Tirunelveli Edc
|
Description |
Improvement Work For Provision Of 11 Kv Linkline For The Purpose Of Load Bifurcation From Existing 11 Kv Keezhkulam And Dhanakarkulam Feeders In Respect Of Avaraikulam Section Under Vallioor Division In Respect Of Tirunelveli Edc
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_532336_1 |
Reference Number |
SE/TEDC/TIN/ETW-44/24-25 |
Tender Fee | 0 |
EMD | 8100 |
Tender Value | |
Place | SE/TEDC/TIN |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=633600 |
Start Date | March 14, 2025 00:20 |
End Date |
27/03/2025 ( Expired 101 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreConsultancy services for preparation of dpr for the fmp work construction of earthen embankment and raising and strengthening of existing embankment in different parts of tripura under fmbap
Consultancy services for preparation of dpr for the fmp work construction of earthen embankment and raising and strengthening of existing embankment in different parts of tripura under fmbap
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram (2nd call)
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreKed/18 of 2025-26 dated 04.07.2025 for the work of creation of gurah-ii feeder by way of laying of new ht line from receiving station gurah kathua in respect of jpdcl electric sub division ramkot of jpdcl electric division kathua under ut capex budge
Creation of gurah-ii feeder by way of laying of new ht line from receiving station gurah kathua in respect of jpdcl electric sub division ramkot of jpdcl electric division kathua under ut capex budget for the year 2025-26
Read moreLabour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Labour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line at rasul nagar 2nd line and bongarala beedu old vehicle shed road for avoid contamination of water and improvement of water supply in div no.53 and 55 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line at rasul nagar 2nd line and bongarala beedu old vehicle shed road for avoid contamination of water and improvement of water supply in div no.53 and 55 under ae-14 section.
Read moreof your Industry type