Tender Details

Particulars Details
Title
New Ht Sc With A Demand Of 500 Kva To Arputham Constructions Thanakkarkulam Village Vallioor Tirunelveli Edc
Description
New Ht Sc With A Demand Of 500 Kva To Arputham Constructions Thanakkarkulam Village Vallioor Tirunelveli Edc
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_526894_1
Reference
Number
SE/TEDC/TIN/ETW 41/24-25
Tender Fee 0
EMD 4300
Tender Value
Place Tirunelveli
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=627387
Start Date February 22, 2025 00:00
End Date

27/02/2025 ( Expired 121 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode

Read more
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Read more
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Read more
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Read more
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)

Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)

Read more
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Read more
Construction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh

Construction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise