Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Effecting New Ht Demand Of 550 Kva To The Twad Board Project Division Sattur At Seevalaperi Village Rural Tirunelveli In Tirunelveli Edc
|
Description |
Effecting New Ht Demand Of 550 Kva To The Twad Board Project Division Sattur At Seevalaperi Village Rural Tirunelveli In Tirunelveli Edc
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_396314_1 |
Reference Number |
SE/TEDC/TIN/ETW62/23 |
Tender Fee | 0 |
EMD | 17400 |
Tender Value | |
Place | SE/TEDC/Tirunelveli |
Link | https://tntenders.gov.in |
Start Date | December 05, 2023 23:30 |
End Date |
19/12/2023 ( Expired 567 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreConstruction of semi covered shed of 2000 mt capacity (1 no of 2000 mt) to an extent of 11.00.00 hectare at moovanallur village in mannargudi taluk in thiruvarur district
Construction of semi covered shed of 2000 mt capacity (1 no of 2000 mt) to an extent of 11.00.00 hectare at moovanallur village in mannargudi taluk in thiruvarur district
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreDesign, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room
Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreRepair/ replacement of lt panel and allied works in bhagat line and south area under age e/m (es) at ge (u) meerut cantt.
Repair/ replacement of lt panel and allied works in bhagat line and south area under age e/m (es) at ge (u) meerut cantt.
Read moreKed/18 of 2025-26 dated 04.07.2025 for the work of creation of gurah-ii feeder by way of laying of new ht line from receiving station gurah kathua in respect of jpdcl electric sub division ramkot of jpdcl electric division kathua under ut capex budge
Creation of gurah-ii feeder by way of laying of new ht line from receiving station gurah kathua in respect of jpdcl electric sub division ramkot of jpdcl electric division kathua under ut capex budget for the year 2025-26
Read moreof your Industry type