Tender Details
Particulars | Details |
---|---|
Title |
Improvement And Black Topping To Revas Reddi Road M.S.H.4 Km. 418/600 To 421/400 Tal. Dapoli Dist. Ratnagiri.
|
Description |
Improvement And Black Topping To Revas Reddi Road M.S.H.4 Km. 418/600 To 421/400 Tal. Dapoli Dist. Ratnagiri.
|
Organisation | Government of Maharashtra |
Tender Id | 2023_PWR_975710_2 |
Reference Number |
NIT_CHD_OPEN_NO_43_2023_2024 |
Tender Fee | 1000 |
EMD | 1.42 Lakh |
Tender Value | |
Place | Superintending Engineer, P.W.Circle,Ratnagiri |
Link | https://mahatenders.gov.in |
Start Date | December 28, 2023 15:30 |
End Date |
10/01/2024 ( Expired 514 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreStrengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Read moreConstruction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam
Construction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam
Read moreUnder chinhat second ward vikalp khand, improvement work by paver finisher of road around the park from m.no. 3/93 to 3/207, 3/194n, 3/215, 3/421 to 3/412, 3/406 to 3/400, 3/423 to 3/376 and 2/178 and from 1/5 to 1/9.
Under chinhat second ward vikalp khand, improvement work by paver finisher of road around the park from m.no. 3/93 to 3/207, 3/194n, 3/215, 3/421 to 3/412, 3/406 to 3/400, 3/423 to 3/376 and 2/178 and from 1/5 to 1/9.
Read moreConstruction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik
Construction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik
Read moreof your Industry type