Tender Details
About Tender
🚂 Procurement Notice: Zone Works For Northern Railway 🛤️ The Ministry Of Railways, Specifically The Central Government's Northern Railway Zone, Is Calling For Bids From Experienced Contractors For The Execution Of Zone Works. The Project Spans From Zone No 17 Cpa(ex) Up To Km 2/2 And Includes The Brt Branch Line To Arl Km 65/0, With A Completion Deadline Of 30.06.2025. 📅 Bid Submission Deadline: 24/05/2024, 3:00 Pm Earnest Money Deposit (Emd): Inr 221500 Interested Contractors Must Submit Detailed Bids, Including A Comprehensive Deion And Adherence To The Tender's Specifications. Keywords: Zone Works, Northern Railway, Ministry Of Railways, Civil Construction, Tender, Bid Submission, Emd, GorakhpurParticulars | Details |
---|---|
Title |
Carrying Out Zone Works For Period Ending 30.06.2025 On Zone No 17 Cpa(ex) Up To Km 2/2 And Brt Branch Line To Arl(inc) Km 65/0.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74680368 |
Reference Number |
NER-IZN-2024-zone-17 |
Tender Fee | 0 |
EMD | 2.22 Lakh |
Tender Value | |
Place | Gorakhpur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74680368/viewNitPdf_4541085.pdf |
Start Date | April 27, 2024 18:19 |
End Date |
24/05/2024 ( Expired 333 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read morePls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp
Pls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreRfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Rfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Read moreConsultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Read moreConstruction of protection wall and protective mesh for tunnel shaft, resectioning of canal from 0 to 26 km, protection wall/bund for jankapur tank on ghodazari branch canal.
Construction of protection wall and protective mesh for tunnel shaft, resectioning of canal from 0 to 26 km, protection wall/bund for jankapur tank on ghodazari branch canal.
Read moreEstimate for shifting of existing htlto/h line and 200 kva dtcs obstructing the traffic from burhani masjid sq. to bijalee nagar rest house, nagpur. under dharampeth zone no.2
Estimate for shifting of existing htlto/h line and 200 kva dtcs obstructing the traffic from burhani masjid sq. to bijalee nagar rest house, nagpur. under dharampeth zone no.2
Read moreEstimate for shifting of existing ht lt o h line and 200 kva dtcs obstructing the traffic from burhani masjid sq. to bijalee nagar rest house, nagpur. under dharampeth zone no.2
Estimate for shifting of existing ht lt o h line and 200 kva dtcs obstructing the traffic from burhani masjid sq. to bijalee nagar rest house, nagpur. under dharampeth zone no.2
Read moreCarrying out related electrical works for proposed bcc back up control center under adms project at src 2nd floor and existing place at telephone exchange ground floor dadar, gate no 3
Carrying out related electrical works for proposed bcc back up control center under adms project at src 2nd floor and existing place at telephone exchange ground floor dadar, gate no 3
Read moreOutsourcing services for various maintenence works under sub division, no. 1 at chandigarh of department water supply and sanitation, punjab for the period of 01 year from the date of allotment (further extendable on year to year performance basis up
Outsourcing services for various maintenence works under sub division, no. 1 at chandigarh of department water supply and sanitation, punjab for the period of 01 year from the date of allotment (further extendable on year to year performance basis up
Read moreof your Industry type