Tender Details

Particulars Details
Title
34(w)/Edcs/2023 24
Description
Installing Of New 3 Phase Lt Line With Other Accessories On Various Places Under Edd 1 Shahjahanpur Under Edc Shahjahanpur (Mvvnl)
Organisation Government of Uttar Pradesh
Tender Id 2023_MVVNL_848173_2
Reference
Number
34(W)/EDCS/2023-24
Tender Fee 3540
EMD 13300
Tender Value
Place SHAHJAHANPUR
Link https://etender.up.nic.in
Start Date October 20, 2023 23:30
End Date

26/10/2023 ( Expired 577 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years

Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years

Read more
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.

Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.

Read more
Ie services for construction of new six lane access controlled capital region ring road from gobindpur (nh 55) to tangi from km. 70.995 to km. 111.325 in the state of odisha under nh(o) on hybrid annuity mode (package 3)

Ie services for construction of new six lane access controlled capital region ring road from gobindpur (nh 55) to tangi from km. 70.995 to km. 111.325 in the state of odisha under nh(o) on hybrid annuity mode (package 3)

Read more
Ie services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)

Ie services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)

Read more
Construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)

Construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)

Read more
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Read more
Rate contract for rewinding / reconditioning of fully carbonized/heat up lt coils, fabrication of new ht coils etc along with dismantling and assembling of dts of various capacities required for immediate restoration of power supply ed2rajbagh

Rate contract for rewinding / reconditioning of fully carbonized/heat up lt coils, fabrication of new ht coils etc along with dismantling and assembling of dts of various capacities required for immediate restoration of power supply ed2rajbagh

Read more
Under central government sponsored amrut 2.0 program pune municipal corporation invites e tender for the work of construction of 125 mld capacity water treatment plant phase 3 with operation and maintenance of the wtp for 7 years at vadgaon, pune

Under central government sponsored amrut 2.0 program pune municipal corporation invites e tender for the work of construction of 125 mld capacity water treatment plant phase 3 with operation and maintenance of the wtp for 7 years at vadgaon, pune

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise