Tender Details

Particulars Details
Title
Providing Intensive Patch Work To Ramanakkapeta Polavaram Road From Km 7.00 To 12.100 In Eluru District.
Description
Providing Intensive Patch Work To Ramanakkapeta Polavaram Road From Km 7.00 To 12.100 In Eluru District.
Organisation Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT
Tender Id 772668
Reference
Number
Short NIT No. 7(14)/TO/2024-25, dt. 16.11.2024 of the Superintending Engineer (RB) Circle, Eluru.
Tender Fee 4712
EMD 1.34 Lakh
Tender Value -
Place AP
Link
View Original Tender Notice

https://tender.apeprocurement.gov.in

Start Date December 06, 2024 20:30
End Date
Expired 13/12/2024

Expired 631 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Maintenance of pathappanagudi to ap border road (sh 243l) from km 0.00 to 3.31 in chalakere taluk and maintenance of chalakere to vishwanathanahalli road (sh-243) km 0.00 to 2.40, km 7.00 to 13.10, km 15.50 to 19.80, km 22.00 to 23.00, km 28.00 to 31.00, km 34.65 to 41.95, km 42.70 to 43.07, km 50.47 to 69.07, km 73.07 to 75.33, km 76.10 to 76.135 and km 79.99 to 84.40 in chalakere taluk

Maintenance of pathappanagudi to ap border road (sh 243l) from km 0.00 to 3.31 in chalakere taluk and maintenance of chalakere to vishwanathanahalli road (sh-243) km 0.00 to 2.40, km 7.00 to 13.10, km 15.50 to 19.80, km 22.00 to 23.00, km 28.00 to 31.00, km 34.65 to 41.95, km 42.70 to 43.07, km 50.47 to 69.07, km 73.07 to 75.33, km 76.10 to 76.135 and km 79.99 to 84.40 in chalakere taluk

Read more
Annual maintenance to ajekar hermunde mundly kervashe mdr from km 1.50 to 9.90, km 10.00 to 10.20, 12.50 to 14.89 in karkala taluk, udupi district.

Annual maintenance to ajekar hermunde mundly kervashe mdr from km 1.50 to 9.90, km 10.00 to 10.20, 12.50 to 14.89 in karkala taluk, udupi district.

Read more
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan

Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan

Read more
Construction of underpass below existing rob on kalanaur to kail road (city portion) yamuna nagar (id 11597) at km. 81.90 in district yamuna nagar (re-invite)

Construction of underpass below existing rob on kalanaur to kail road (city portion) yamuna nagar (id 11597) at km. 81.90 in district yamuna nagar (re-invite)

Read more
Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis

Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis

Read more
Resurvey of sonandoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Resurvey of sonandoor block proposed reserved forests notified u/s 4 of kfa-1963 with its boundary length measuring approximately 7.00 km in belthangady range, mangalore division, during 2026-27, in order to provide technical support to the fso & the dcf during the process of settlement and preparation of settlement map to be signed jointly by the both and also for preparation of tie-line map and draft notification u/s 17 of kfa 1963.

Read more
Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode

Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode

Read more
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode

Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode

Read more
Intensive patch work to polavaram branch road from km 0.000 to 2.695 in eluru district (working reach from km0.000 to 1.000)

Intensive patch work to polavaram branch road from km 0.000 to 2.695 in eluru district (working reach from km0.000 to 1.000)

Read more
Intensive patch work to polavaram branch road from km 0.000 to 2.695 in eluru district (working reach from km0.000 to 1.000)

Intensive patch work to polavaram branch road from km 0.000 to 2.695 in eluru district (working reach from km0.000 to 1.000)2nd call

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise