Tender Details
Particulars | Details |
---|---|
Title |
Operation And Maintenance Of Swaroopganj Pindwara Section (From Km. 264.000 To 248.700) And Pindwara Udaipur Section (From Km. 0.000 To Km. 104.724) Total Length 120.024 Kms.In The State Of Rajasthan
|
Description |
Operation And Maintenance Of Swaroopganj Pindwara Section (From Km. 264.000 To 248.700) And Pindwara Udaipur Section (From Km. 0.000 To Km. 104.724) Total Length 120.024 Kms.In The State Of Rajasthan
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_228950_1 |
Reference Number |
NHAI/11011/1/2025-ROJ/OnM/SPU |
Tender Fee | 50000 |
EMD | 50 Lakh |
Tender Value | |
Place | NHAI RO JAIPUR |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=257550 |
Start Date | March 06, 2025 00:25 |
End Date |
01/04/2025 ( Expired 19 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for authoritys engineer for supervision of widening/improvement of existing road to nhdl specifications of road changwinti walong namti from km 0.000 to km 54.450 and hayuliang-changwinti between km 45.050 to km 50.820
Consultancy services for authoritys engineer for supervision of widening/improvement of existing road to nhdl specifications of road changwinti walong namti from km 0.000 to km 54.450 and hayuliang-changwinti between km 45.050 to km 50.820
Read moreRenewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Read morePerformance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Read moreRehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreConsultancy services for preparation of dpr for four laning of thamaraipatti to t.pudupatti section (madurai ring road phase-ii) from km 29.960 to km 83.170 (length 53.210 km) of nh-744a in the state of tamil nadu
Consultancy services for preparation of dpr for four laning of thamaraipatti to t.pudupatti section (madurai ring road phase-ii) from km 29.960 to km 83.170 (length 53.210 km) of nh-744a in the state of tamil nadu
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreof your Industry type