Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Survey, Installation, Testing And Commissioning Of 11 Kv Line, 11 Kv Additional Bay, 11/0.433 Kv Distribution Transformer And Lt Line Under Different Schemes In Onm Circle Mandla
|
| Description |
Survey, Installation, Testing And Commissioning Of 11 Kv Line, 11 Kv Additional Bay, 11/0.433 Kv Distribution Transformer And Lt Line Under Different Schemes In Onm Circle Mandla
|
| Organisation | Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
| Tender Id | 2024_PKVVC_381658_1 |
|
Reference Number |
3203 DT 12.11.2024 |
| Tender Fee | 3059 |
| EMD | 59220 |
| Tender Value | |
| Place | S.E.ONM CHUNNA BHATTA ROAD MANDLA |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=450007 |
| Start Date | November 14, 2024 18:30 |
| End Date |
Expired
29/11/2024
Expired 582 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reapir and maintenance of 11/0.433 distribution transformers and 33/11 kv power transformers, outdoor ht structures at drdl/asl area under ge (i) rnd kanchanbagh, hyderabad
Reapir and maintenance of 11/0.433 distribution transformers and 33/11 kv power transformers, outdoor ht structures at drdl/asl area under ge (i) rnd kanchanbagh, hyderabad
Read moreRepair/maint/renovation of chemical/copper/gi earthing of power transformer, distribution transformer vcbs, lt panels, servo voltage stabilizer, isolation transformer and connected works at af stn chabua under ge (af) chabua
Repair/maint/renovation of chemical/copper/gi earthing of power transformer, distribution transformer vcbs, lt panels, servo voltage stabilizer, isolation transformer and connected works at af stn chabua under ge (af) chabua
Read moreA)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line of sarubera colliery .
A)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line at sarubera colliery.
Read moreExpression of interest of equipment for setting up a 2mwh cell fabrication line for cylindrical and prismatic cells supply, installation, commissioning, demonstration, testing, training of 2mwh cell fabrication line
Expression of interest of equipment for setting up a 2mwh cell fabrication line for cylindrical and prismatic cells supply, installation, commissioning, demonstration, testing, training of 2mwh cell fabrication line
Read moreSurvey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Survey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Read moreIn the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
Read moreRepair/ maint/ replacement of lt panel, and allied works in bhagat line and south area under age e/m elect supply at ge (u) e/m meerut cantt.
Repair/ maint/ replacement of lt panel, and allied works in bhagat line and south area under age e/m elect supply at ge (u) e/m meerut cantt.
Read moreRepair/maint and improvement of lt distribution network, lt panel, fp box and other allied works in sector e and sector f otm and md accn in army area under ge (a) no.1 jodhpur
Repair/maint and improvement of lt distribution network, lt panel, fp box and other allied works in sector e and sector f otm and md accn in army area under ge (a) no.1 jodhpur
Read moreMlasdf 2023-24 of sri. xavier chittilappilly mla - supply, installation, testing, and commissioning of mini mast systems at various locations in avanurgramapanchayat, wadakkanchery lac
Mlasdf 2023-24 of sri. xavier chittilappilly mla - supply, installation, testing, and commissioning of mini mast systems at various locations in avanurgramapanchayat, wadakkanchery lac
Read moreErection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrrangement at topa ocp under kuju area.
Erection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrangement at topa ocp under kuju area.
Read moreof your Industry type