Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Empanelment Of Erection Contractors For Survey, 11 Kv Line, 11/0.433 Kv Distribution Transformer And Schemes In (Onm) Circle Balaghat
|
Description |
Empanelment Of Erection Contractors To Award A Contract For Survey, Installation, Testing And Commissioning&Amp#X0d
Of 11 K V Line, 11/0.433 K V Distribution Transformer And Lt Line Under Different Schemes In The (Onm) Circle&Amp#X0d
Balaghat.
|
Organisation | Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
Tender Id | 2025_PKVVC_407772_1 |
Reference Number |
SE/ONM/BGT/PUR/25-26/4440 Date 07.03.25 |
Tender Fee | 7434 |
EMD | 1 Lakh |
Tender Value | |
Place | S.E. (ONM) Circle MPPKVVCL Balaghat |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=494141 |
Start Date | April 25, 2025 22:00 |
End Date |
02/05/2025 ( Expired 64 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Read moreConstruction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreConstruction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read moreConstruction of various 220 kv transmission lines associated with 220kv gss bambloo (dist-bikaner) including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning (turnkey project) bn9019002517
Construction of various 220 kv transmission lines associated with 220kv gss bambloo (dist-bikaner) including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning (turnkey project) bn9019002517
Read moreEmpanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv sub stations and lines construction of new 33 kv lines augmentation of existing 33 kv lines and
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv substations and lines construction of new 33 kv lines augmentation of existing 33 kv lines
Read moreDes, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Read moreConstruction of 1 no bay and its allied civil works for 66 kv s s jalal at 66 kv s s bhagta bhai ka under op. circle, bathinda
Construction of 1 no bay and its allied civil works for 66 kv s s jalal at 66 kv s s bhagta bhai ka under op. circle, bathinda
Read moreConstruction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle.
Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle
Read moreConstruction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.
Construction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.
Read moreof your Industry type