Tender Details

Particulars Details
Title
Repair Of Rehabilitation And Upgradation Of Digras Darwha Karanja Section In (Km 0.000 To 74.351) Nh 361 C Two Lane With Paved Shoulder Configuration In The State Of Maharashtra.
Description
Repair Of Rehabilitation And Upgradation Of Digras Darwha Karanja Section In (Km 0.000 To 74.351) Nh 361 C Two Lane With Paved Shoulder Configuration In The State Of Maharashtra.
Organisation Central Public Procurement Portal 1
Tender Id 2023_MoRTH_770904_1
Reference
Number
NIT42/EENH/AKL/2023-24
Tender Fee 5900
EMD 2.4 Lakh
Tender Value -
Place Superitending Engineer NHC Nagpur
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date September 09, 2023 21:55
End Date
Expired 22/01/2024

Expired 997 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Read more
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).

Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Consultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m

Consultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m

Read more
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Read more
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.

Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.

Read more
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh

Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh

Read more
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper

Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise