Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔥 Procurement Opportunity: Castable Firecrete Refractory For Sagardighi Thermal Power Project 🔥 The West Bengal Power Development Corporation Ltd., On Behalf Of The State Government, Is Seeking Bids From Reputable Suppliers For The Procurement Of Castable Firecrete Refractory To Be Used In The Insulation Work Of The Inside Bottom Ash Hopper Unit 4 At The Sagardighi Thermal Power Project (Sg Tpp). 📅 Bid Submission Deadline: June 17, 2024, 3:00 Pm Interested Suppliers Are Requested To Submit Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules, In Accordance With The Project Requirements. Keywords: Procurement, Castable Firecrete Refractory, Insulation Work, Sagardighi Thermal Power Project, Power Development, West Bengal Government, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Procurement Of Castable Firecrete Refractory For Insulation Work Of Inside Bottom Ash Hopper Unit4 Sg Tpp.
|
| Description |
Procurement Of Castable Firecrete Refractory For Insulation Work Of Inside Bottom Ash Hopper Unit4 Sg Tpp.
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2024_WBPDC_689644_1 |
|
Reference Number |
SgTPP/PUR/2/4000023373/24-25 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Sagardighi Thermal Power Project |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1502051 |
| Start Date | June 06, 2024 20:30 |
| End Date |
Expired
17/06/2024
Expired 851 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Read moreProcurement of excen crusher assembly and its spares and different spares for bottom ash hopper for unit 5 oh under ahp mm
Procurement of excen crusher assembly and its spares and different spares for bottom ash hopper for unit 5 oh under ahp mm
Read moreTggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreTtps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreProcurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit4 during overhauling in 2024 25,sgtpp
Procurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit4 during overhauling in 2024 25,sgtpp
Read moreProcurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit 3 during overhauling in 2025 26 for sgtpp wbpdcl
Procurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit 3 during overhauling in 2025 26 for sgtpp wbpdcl.
Read moreof your Industry type