Tender Details

About Tender

🏭 Procurement Opportunity: Scaffolding And Refractory Work At Anpara Thermal Power Station 🏭 Up Rajya Vidyut Utpadan Nigam Ltd, A State Government Undertaking, Is Seeking Bids For The Fixing Of Scaffolding And Replacement Of Castable Refractory In The Bottom Ash Hopper Of The Ash Handling Plant During The Overhauling Of Unit 7, 2 X500 Mw At Anpara Thermal Power Station. 📅 Bid Submission Deadline: April 9, 2024, 6:00 Pm Tender Fee: Inr 1180 Emd: Inr 5000 Interested Bidders Must Possess The Necessary Expertise And Equipment To Undertake This Critical Infrastructure Project. Detailed Proposals, Including Methodology, Timelines, And Cost Estimates, Are To Be Submitted In Accordance With The Project Specifications. Keywords: Scaffolding, Refractory Work, Ash Handling Plant, Anpara Thermal Power Station, Up Rajya Vidyut Utpadan Nigam Ltd, Power Sector, Government Tender, Overhauling, Tender Fee, Emd
Particulars Details
Title
Fixing Of Scaffolding And Replacement Of Castable Refractory In Bottom Ash Hopper Of Ash Handling Plant
Description
Fixing Of Scaffolding And Replacement Of Castable Refractory In Bottom Ash Hopper Of Ash Handling Plant During Overhauling Of Unit 7, 2 X500 Mw, Dtps, Anpara
Organisation UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT
Tender Id 2024_RVUNL_912972_1
Reference
Number
01/AHD/DTPS/OH#7/2024-25
Tender Fee 1180
EMD 5000
Tender Value
Place Anpara Thermal Power Station
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1576856
Start Date March 07, 2024 14:30
End Date

09/04/2024 ( Expired 447 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Read more
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work

Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)

Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)

Read more
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Read more
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Licensing of co-branding and inside advertising rights

Licensing of co-branding and inside advertising rights of fifteen no. metro&#x0d stations of corridor-1 (iit kanpur-naubasta) of kanpur metro rail project in&#x0d upmrc network

Read more
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise