Tender Details
About Tender
🏭 Procurement Opportunity: Scaffolding And Refractory Work At Anpara Thermal Power Station 🏭 Up Rajya Vidyut Utpadan Nigam Ltd, A State Government Undertaking, Is Seeking Bids For The Fixing Of Scaffolding And Replacement Of Castable Refractory In The Bottom Ash Hopper Of The Ash Handling Plant During The Overhauling Of Unit 7, 2 X500 Mw At Anpara Thermal Power Station. 📅 Bid Submission Deadline: April 9, 2024, 6:00 Pm Tender Fee: Inr 1180 Emd: Inr 5000 Interested Bidders Must Possess The Necessary Expertise And Equipment To Undertake This Critical Infrastructure Project. Detailed Proposals, Including Methodology, Timelines, And Cost Estimates, Are To Be Submitted In Accordance With The Project Specifications. Keywords: Scaffolding, Refractory Work, Ash Handling Plant, Anpara Thermal Power Station, Up Rajya Vidyut Utpadan Nigam Ltd, Power Sector, Government Tender, Overhauling, Tender Fee, EmdParticulars | Details |
---|---|
Title |
Fixing Of Scaffolding And Replacement Of Castable Refractory In Bottom Ash Hopper Of Ash Handling Plant
|
Description |
Fixing Of Scaffolding And Replacement Of Castable Refractory In Bottom Ash Hopper Of Ash Handling Plant During Overhauling Of Unit 7, 2 X500 Mw, Dtps, Anpara
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id | 2024_RVUNL_912972_1 |
Reference Number |
01/AHD/DTPS/OH#7/2024-25 |
Tender Fee | 1180 |
EMD | 5000 |
Tender Value | |
Place | Anpara Thermal Power Station |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1576856 |
Start Date | March 07, 2024 14:30 |
End Date |
09/04/2024 ( Expired 423 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreJp/b862-102-lz-mr-4040/513 - bagging and palletizing package for pdh pp plant with ethane and propane handling facilities project of petronet lng limited, dahej (gujarat)
Bagging and palletizing package for pdh pp plant with ethane and propane handling facilities project of petronet lng limited, dahej (gujarat)
Read moreRepair and maintenance of primary health care centre at mimi village of kiphire district in nagalan
Repair and maintenance of primary health care centre at mimi village of kiphire district in nagalan
Read moreof your Industry type