Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Castable Firecrete Refractory For Insulation Work Of Inside Bottom Ash Hopper Unit 3 During Overhauling In 2025 26 For Sgtpp Wbpdcl
|
| Description |
Procurement Of Castable Firecrete Refractory For Insulation Work Of Inside Bottom Ash Hopper Unit 3 During Overhauling In 2025 26 For Sgtpp Wbpdcl.
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_854524_1 |
|
Reference Number |
WBPDCL/SGTPP/NIT/E3494/25-26 |
| Tender Fee | 0 |
| EMD | 18025 |
| Tender Value | - |
| Place | Sagardighi Thermal Power Project(SgTPP) |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1911713 |
| Start Date | June 02, 2025 20:30 |
| End Date |
Expired
23/06/2025
Expired 477 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Mtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Read moreTtps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreProcurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit4 sgtpp.
Procurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit4 sgtpp.
Read moreProcurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit4 during overhauling in 2024 25,sgtpp
Procurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit4 during overhauling in 2024 25,sgtpp
Read moreFixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant
Fixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant during overhauling of unit 7, 2x500mw, dtps, anpara
Read moreof your Industry type