Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏭 Urgent Tender Invitation: Scaffolding & Refractory Work At Anpara 🏭 Up Rajya Vidyut Utpadan Nigam Ltd, A State Government Undertaking, Invites Tenders From Experienced Contractors For The Critical Project Of Fixing Scaffolding And Replacement Of Castable Refractory In The Bottom Ash Hopper Of The Ash Handling Plant At Anpara Thermal Power Station. 📅 Submission Deadline: April 29, 2024, 5:00 Pm Tender Fee: Inr 590 Emd: Inr 5000 This Project Is Part Of The Overhauling Of Unit 7, 2 X500 Mw At Dtps, Anpara. Interested Bidders Must Submit Detailed Proposals, Including Methodology, Timelines, And Compliance With Safety And Quality Standards. Keywords: Scaffolding, Refractory Work, Ash Handling Plant, Overhauling, Up Rajya Vidyut Utpadan Nigam Ltd, Thermal Power Station, Anpara, Government Tender, Tender InvitationParticulars | Details |
---|---|
Title |
Fixing Of Scaffolding And Replacement Of Castable Refractory In Bottom Ash Hopper Of Ash Handling Plant
|
Description |
Fixing Of Scaffolding And Replacement Of Castable Refractory In Bottom Ash Hopper Of Ash Handling Plant During Overhauling Of Unit 7, 2 X500 Mw, Dtps, Anpara
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id | 2024_RVUNL_918196_1 |
Reference Number |
01/AHD/DTPS/OH-7/2024-2025 |
Tender Fee | 590 |
EMD | 5000 |
Tender Value | |
Place | Anpara Therma Power Station |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1586688 |
Start Date | March 16, 2024 15:30 |
End Date |
29/04/2024 ( Expired 428 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreImplementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreTolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Read moreTolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreLicensing of co-branding and inside advertising rights
Licensing of co-branding and inside advertising rights of fifteen no. metro
 stations of corridor-1 (iit kanpur-naubasta) of kanpur metro rail project in
 upmrc network
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreof your Industry type