Tender Details

Particulars Details
Title
Design Supply Construction Erection Testing Commissioning Operation Maintenance For Five Years After Commissioning Of Lazer Show In Moti Lake For Sawantwadi Municipal Council
Description
Design Supply Construction Erection Testing Commissioning Operation Maintenance For Five Years After Commissioning Of Lazer Show In Moti Lake For Sawantwadi Municipal Council
Organisation Directorate Of Municipal Administration | State Govt. and UT
Tender Id 2024_DMA_1055409_1
Reference
Number
smc/con/ETenderNo 2/2024-25
Tender Fee 15000
EMD 7.54 Lakh
Tender Value -
Place sawantwadi
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1842762

Start Date July 20, 2024 00:25
End Date
Expired 30/07/2024

Expired 808 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Design, manufacture, supply and erection of 05 (five) ton capacity diesel hydraulic rail crane.

Design, manufacture, supply and erection of 05 (five) ton capacity diesel hydraulic rail crane.

Read more
Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at five 05 elevated stations

Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at five 05 elevated stations

Read more
Design, engineering, supply, erection, commissioning, ensuring connectivity permissions of 1086 kw grid connected solar roof top power plants including 5years camc after successful commissioning at jagannath ocp

Design, engineering, supply, erection, commissioning, ensuring connectivity permissions of 1086 kw grid connected solar roof top power plants including 5years camc after successful commissioning at jagannath ocp

Read more
Design supply installation testing and commissioning of fire and gas alarm detection system at srpl asanur pump station and annual maintenance contract for a period of five years after defect liability period

Design supply installation testing and commissioning of fire and gas alarm detection system at srpl asanur pump station and annual maintenance contract for a period of five years after defect liability period

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Read more
Design, supply, construction, erection, testing, commissioning, operation maintenance for five years after commissioning of lazer show in moti lake for sawantwadi municipal council.

Design, supply, construction, erection, testing, commissioning, operation maintenance for five years after commissioning of lazer show in moti lake for sawantwadi municipal council.

Read more
Design, supply, construction, erection, testing, commissioning, operation and maintenance for five years after commissioning of lazer show (as per technical sanctioned estimate ) in moti lake for sawantwadi municipal council.

Design, supply, construction, erection, testing, commissioning, operation and maintenance for five years after commissioning of lazer show (as per technical sanctioned estimate ) in moti lake for sawantwadi municipal council.

Read more
Survey design and execution of sewerage scheme dal lake uncovered areas pollution abatement of dal lake uncovered areas kashmir j and k on epc fixed cost turnkey basis incld. operation and maintenance for 5 years after successful completion of free

Survey design and execution of sewerage scheme dal lake uncovered areas pollution abatement of dal lake uncovered areas kashmir j and k on epc fixed cost turnkey basis incld. operation and maintenance for 5 years after successful completion of free

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise