Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Supply, Construction, Erection, Testing, Commissioning, Operation Maintenance For Five Years After Commissioning Of Lazer Show In Moti Lake For Sawantwadi Municipal Council.
|
| Description |
Design, Supply, Construction, Erection, Testing, Commissioning, Operation Maintenance For Five Years After Commissioning Of Lazer Show In Moti Lake For Sawantwadi Municipal Council.
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_DMA_935277_1 |
|
Reference Number |
smc/con/ETenderNo 4/2023-24 |
| Tender Fee | 1000 |
| EMD | 50000 |
| Tender Value | 1 |
| Place | CO Chamber, Sawantwadi Municipal Council Office |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | August 14, 2023 19:30 |
| End Date |
Expired
29/08/2023
Expired 1144 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, manufacture, supply and erection of 05 (five) ton capacity diesel hydraulic rail crane.
Design, manufacture, supply and erection of 05 (five) ton capacity diesel hydraulic rail crane.
Read moreArchitectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at five 05 elevated stations
Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at five 05 elevated stations
Read moreDesign, engineering, supply, erection, commissioning, ensuring connectivity permissions of 1086 kw grid connected solar roof top power plants including 5years camc after successful commissioning at jagannath ocp
Design, engineering, supply, erection, commissioning, ensuring connectivity permissions of 1086 kw grid connected solar roof top power plants including 5years camc after successful commissioning at jagannath ocp
Read moreDesign supply installation testing and commissioning of fire and gas alarm detection system at srpl asanur pump station and annual maintenance contract for a period of five years after defect liability period
Design supply installation testing and commissioning of fire and gas alarm detection system at srpl asanur pump station and annual maintenance contract for a period of five years after defect liability period
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreDesign supply construction erection testing commissioning operation maintenance for five years after commissioning of lazer show in moti lake for sawantwadi municipal council
Design supply construction erection testing commissioning operation maintenance for five years after commissioning of lazer show in moti lake for sawantwadi municipal council
Read moreDesign, supply, construction, erection, testing, commissioning, operation and maintenance for five years after commissioning of lazer show (as per technical sanctioned estimate ) in moti lake for sawantwadi municipal council.
Design, supply, construction, erection, testing, commissioning, operation and maintenance for five years after commissioning of lazer show (as per technical sanctioned estimate ) in moti lake for sawantwadi municipal council.
Read moreDesign, manufacturing, supply,erection,testing and commissioning of 2 no .s passenger lifts suitable for 10 passengers along with all the work including buy back of old lifts with five years comprehensive maintenance contract after one years warranty
Supply, installation, testing and commissioning of passenger/luggage lilts with or without amc
Read moreSurvey design and execution of sewerage scheme dal lake uncovered areas pollution abatement of dal lake uncovered areas kashmir j and k on epc fixed cost turnkey basis incld. operation and maintenance for 5 years after successful completion of free
Survey design and execution of sewerage scheme dal lake uncovered areas pollution abatement of dal lake uncovered areas kashmir j and k on epc fixed cost turnkey basis incld. operation and maintenance for 5 years after successful completion of free
Read moreof your Industry type