Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rfp For Selection Of System Integrator For Supply, Installation And Commissioning Of Laptops
|
| Description |
Rfp For Selection Of System Integrator For Supply, Installation And Commissioning Of Laptops
|
| Organisation | IT Directorate | State Govt. and UT |
| Tender Id | 2025_ITD_1177381_1 |
|
Reference Number |
MahaIT/TC500/001/074 |
| Tender Fee | 19500 |
| EMD | 1.9 Lakh |
| Tender Value | |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2044683 |
| Start Date | May 05, 2025 23:30 |
| End Date |
Expired
21/05/2025
Expired 425 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.
Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.
Read moreReplacement of old 11kv panels of (2x10) mva receiving station brein by way of supply, installation, testing and commissioning of new 11kv (2plus4) panel set.
Replacement of old 11kv panels of (2x10) mva receiving station brein by way of supply, installation, testing and commissioning of new 11kv (2plus4) panel set.
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreSupply and construction for artillery battery module
Supply and construction for artillery battery module
Read moreDesign, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.
Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.
Read moreDetailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Read moreTiruppur city municipal corporation_outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Read moreof your Industry type