Tender Details

Particulars Details
Title
P Grills 2
Description
Fabrication, Supply, Installation Of Protective Grill On Circular And &Amp#X0d Rectangular Manhole At 37th, 35th , 40th , 1st , 3rd &Amp#X0d , 5th, 28th , 29th , 23rd , 25th , 27th , St. &Amp#X0d Anthony Schl Rd, 31st , 13th , 8th, 7th,Dr. Ambedkar Road, Pali Mala Raod
Organisation Municipal Corporation of Greater Mumbai | State Govt. and UT
Tender Id 2024_MCGM_1027035_1
Reference
Number
P.GRILLS 2
Tender Fee 0
EMD 16200
Tender Value
Place H WEST
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1795785
Start Date March 06, 2024 14:30
End Date

11/03/2024 ( Expired 438 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Phase-2 - driver and final stage amplifiers for 2 sets of

Phase-2 - driver and final stage amplifiers for 2 sets of&#x0d iter icrf sources

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode

Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode

Read more
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Read more
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Read more
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise