Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Wbm And Bt On Road From Napane Railway Station To Kokatewadi Kusur Road In Km 0/688 To 1/800 Tal Vaibhavwadi
|
| Description |
Providing Wbm And Bt On Road From Napane Railway Station To Kokatewadi Kusur Road In Km 0/688 To 1/800 Tal Vaibhavwadi
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_SINDH_921047_4 |
|
Reference Number |
SZP/WD/SUBE/TNDR/11/23 |
| Tender Fee | 500 |
| EMD | 12500 |
| Tender Value | |
| Place | Executive Engg. Work department z p sinhudurg |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | July 01, 2023 00:25 |
| End Date |
Expired
19/07/2023
Expired 1053 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rob parallel to the existing rob on panipat g.t. road to dahar upto nh-709 on delhi- ambala railway section at km. 87/1-2 in panipat distt
Construction of rob parallel to the existing rob on panipat g.t. road to dahar upto nh-709 on delhi- ambala railway section at km. 87/1-2 in panipat distt
Read moreWork on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Stmc work on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Read moreGeneral sf works 2025 26 improvements to nediyavila vembanattazhikathu road by providing bm bc from ch3 000 4 800 km in kunnathur lac general civil work
General sf works 2025 26 improvements&#x0d to nediyavila vembanattazhikathu road by&#x0d providing bm bc from ch3 000 4 800 km in kunnathur lac general civil work
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreStrengthening of road from belonia to srinagar ch1100 km to 3950 km length 2850 km on engineering procurement construction epc mode
Strengthening of road from belonia to srinagar ch1100 km to 3950 km length 2850 km on engineering procurement construction epc mode
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read morePreparation of dpr as per prescribed in particular for doubling of existing single railway track from bir railway station to plant premises at sstpp, mppgcl, dongalia distt. khandwa .
Preparation of dpr as per prescribed in particular for doubling of existing single railway track from bir railway station to plant premises at sstpp, mppgcl, dongalia distt. khandwa .
Read moreIndependent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Read moreImprovement of bada bazar old nh-5 to via- brahmun dhamana street, odia dhamana street, sankha bandha, phd, old jayashree main road to potagada of ganjam nac from 0/329 km to 1/551 km
Improvement of bada bazar old nh-5 to via- brahmun dhamana street, odia dhamana street, sankha bandha, phd, old jayashree main road to potagada of ganjam nac from 0/329 km to 1/551 km
Read moreImp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26
Imp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26
Read moreof your Industry type