Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Nh 130 D Up Gradation Project 🛣️ The Ministry Of Road Transport And Highways, Under The Central Government, Invites Bids For The Up Gradation Of A Section Of National Highway 130 D From Akabeda To Kasturmeta, Covering A Distance Of 4.760 Km From Km 65.600 To Km 70.453, To A Two Four Lane With A Paved Shoulder Configuration. 📅 Bid Submission Deadline: August 12, 2024, 5:30 Pm Tender Fee: Inr 11,800 Emd: Inr 3,38,566.90 Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Project Specifications And Guidelines. Keywords: Nh 130 D, Highway Up Gradation, Infrastructure Development, Ministry Of Road Transport And Highways, Central Government, Bid, Tender, Engineering Procurement Construction (Epc)| Particulars | Details |
|---|---|
| Title |
Up Gradation To Two Four Lane With Paved Shoulder Configuration Akabeda To Kasturmeta In Km 65.600 To 70.453 4.760 Km Of Nh 130 D (Part 3)
|
| Description |
Up Gradation To Two Four Lane With Paved Shoulder Configuration Akabeda To Kasturmeta In Km 65.600 To 70.453 4.760 Km Of Nh 130 D (Part 3)
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_813538_1 |
|
Reference Number |
89/CE/NH/TC/44-26/2024 |
| Tender Fee | 11800 |
| EMD | 33.86 Lakh |
| Tender Value | - |
| Place | Kasturmeta |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=855386 |
| Start Date | June 28, 2024 00:25 |
| End Date |
Expired
18/09/2024
Expired 757 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreUp gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreWidening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Read moreConstruction of cement concrete road of 2 lane with paved shoulder configuration from km. 168.180 shitala mata mandir to km 168.920 railway crossing total length - 740 m on bhandara-khat-ghotitok road nh-247 in the state of maharashtra
Construction of cement concrete road of 2 lane with paved shoulder configuration from km. 168.180 shitala mata mandir to km 168.920 railway crossing total length - 740 m on bhandara-khat-ghotitok road nh-247 in the state of maharashtra
Read moreof your Industry type