Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbiw/Ee/Bid/E Nit 04/2025 26
|
| Description |
Sub Soil Investigation Work In Connection To The Work Construction Of Rcc Bridge Over River Bramhani Connecting Vill Jafarpur Namo Jadavpur On The Left And Right Bank Of River Bramhani Under Block Ps Nabagram Khargram Dist Murshidabad
|
| Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
| Tender Id | 2025_IWD_864976_1 |
|
Reference Number |
WBIW/EE/BID/e-NIT-04/2025-26 |
| Tender Fee | 0 |
| EMD | 3262 |
| Tender Value | - |
| Place | NABAGRAM |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1943338 |
| Start Date | June 17, 2025 17:00 |
| End Date |
Expired
24/06/2025
Expired 422 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Wbiw/ee/bid/e-nit-08/2025-26/1
Subsoil invstgtn work in connection to work constn of rcc bridge over river bramhani connecting vill jafarpur namo jadavpur on the left and right bank of river bramhani under block ps nabagram khargram dist murshidabad
Read moreWbiw/ee/bid/e-nit-05/2025-26/1
Sub soil investigation work in connection to work constr of rcc bridge over river bramhani connecting vill jafarpur and namo jadavpur on left and right bank of river bramhani under block nd ps nabagram nd khargram dist murshidabad 2nd call
Read moreGeneral-parassinikkadavu boat terminal - soil investigation - construction of boat terminal at parassinikkadavu on left bank of valapattanam river in mayyil grama panchayath-investigation work
General-parassinikkadavu boat terminal - soil investigation - construction of boat terminal at parassinikkadavu on left bank of valapattanam river in mayyil grama panchayath-investigation work
Read moreWbiw/ee/bid/e-snit-12/25-26/3
Emergent restoration work to close the breach of embankment to the right bank of river brahmani near village namo jadabpur mouza jadabpur gp jhilli in ps and block khargram dist murshidabad
Read moreSoil investigation for construction of a new bridge over sali river at vill -bhagabatipur, g.p.- rol, block - indus, dist- bankura apas/01/257/75/0001
Soil investigation for construction of a new bridge over sali river at vill -bhagabatipur, g.p.- rol, block - indus, dist- bankura apas/01/257/75/0001
Read moreProposed rcc bridge at ch. 1350 over mayurakshi branch canal in mouza- uplai, p.s- khargram, dist.- murshidabad (2nd call in connection with the 1st call bearing e-nit no. wbiw/ee/mncd/nit-3(e)/2025-26, sl.no.3)
Proposed rcc bridge at ch. 1350 over mayurakshi branch canal in mouza- uplai, p.s- khargram, dist.- murshidabad (2nd call in connection with the 1st call bearing e-nit no. wbiw/ee/mncd/nit-3(e)/2025-26, sl.no.3)
Read moreRestoration/repair of flood protection work in river tawi from d/s of kishanpur manwal bridge to upstream of peerkhoo on left and right bank of river tawi for the period upto 31-03-2024
Restoration/repair of flood protection work in river tawi from d/s of kishanpur manwal bridge to upstream of peerkhoo on left and right bank of river tawi for the period upto 31-03-2024
Read moreProtection work of abutment of bailey bridge over tangling nallah on shongtong road at km 1.545 sub head c.o wire crate protection wall with cc toe wall in both left and right bank of nallah under sdmf
Protection work of abutment of bailey bridge over tangling nallah on shongtong road at km 1.545 sub head c.o wire crate protection wall with cc toe wall in both left and right bank of nallah under sdmf
Read moreExtension of existing embankment along the right bank of river haora from adarsha pally to pratapgarh rcc bridge _length_650.00 mtr_ including protection work at the required places under sadar sub-division, west tripura.
Extension of existing embankment along the right bank of river haora from adarsha pally to pratapgarh rcc bridge _length_650.00 mtr_ including protection work at the required places under sadar sub-division, west tripura.
Read moreConstruction of 4 lane connecting road of tawi riverfront development project and pre stressed concrete bridge over ranbir canal rc and distributary 9 on right bank and construction of rcc retaining wall adjoining project boundaries at trf jammu
Construction of 4 lane connecting road of tawi riverfront development project and pre stressed concrete bridge over ranbir canal rc and distributary 9 on right bank and construction of rcc retaining wall adjoining project boundaries at trf jammu
Read moreof your Industry type