Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 4 Lane Connecting Road Of Tawi Riverfront Development Project And Pre Stressed Concrete Bridge Over Ranbir Canal Rc And Distributary 9 On Right Bank And Construction Of Rcc Retaining Wall Adjoining Project Boundaries At Trf Jammu
|
Description |
Construction Of 4 Lane Connecting Road Of Tawi Riverfront Development Project And Pre Stressed Concrete Bridge Over Ranbir Canal Rc And Distributary 9 On Right Bank And Construction Of Rcc Retaining Wall Adjoining Project Boundaries At Trf Jammu
|
Organisation | Jammu Smart City Limited | State Govt. and UT |
Tender Id | 2025_SPV_271227_1 |
Reference Number |
JSCL 170/01 of 2024-25 |
Tender Fee | 15000 |
EMD | 57.39 Lakh |
Tender Value | |
Place | Jammu |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=838564 |
Start Date | February 05, 2025 21:30 |
End Date |
26/02/2025 ( Expired 76 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rcc lined canal with retaining wall and rcc solid bridge for bukcle canel chaninage from 7140 m to 7490 m fci godown
Construction of rcc lined canal with retaining wall and rcc solid bridge for bukcle canel chaninage from 7140 m to 7490 m fci godown
Read moreGt works and material survey for preparation of dpr for construction of a 4 lane major bridge over river bhagirathi,including viaducts,rob interchanges, other major and minor bridges, grade separators, etc connecting kalna of stkk road in west bengal
Gt works and material survey for preparation of dpr for construction of a 4 lane major bridge over river bhagirathi,including viaducts,rob interchanges, other major and minor bridges, grade separators, etc connecting kalna of stkk road in west bengal
Read moreConstruction of three foot over bridge on nira left bank canal at ghare bangla and teen mori under baramati municipal corporation tal. baramati, dist. pune.
Construction of three foot over bridge on nira left bank canal at ghare bangla and teen mori under baramati municipal corporation tal. baramati, dist. pune.
Read moreConstruction of steel bridge single span 58 m long over bml canal crossing ropar to purkhali via majri jattan fathepur bhangala road in km 1 including its approaches retaining walls and footpath in district rupnagar
Construction of steel bridge single span 58 m long over bml canal crossing ropar to purkhali via majri jattan fathepur bhangala road in km 1 including its approaches retaining walls and footpath in district rupnagar
Read moreConstruction of road and bridge over rengali canal from n.h-55 to sadasivpur railway station including rcc drain along the approach road in the district of dhenkanal for the year 2024-25
Construction of road and bridge over rengali canal from n.h-55 to sadasivpur railway station including rcc drain along the approach road in the district of dhenkanal for the year 2024-25
Read moreConstruction of 4 lane connecting road of tawi riverfront development project and pre stressed concrete bridge over ranbir canal rc and distributary 9 on right bank and construction of rcc retaining wall adjoining project boundaries at trf jammu
Construction of 4 lane connecting road of tawi riverfront development project and pre stressed concrete bridge over ranbir canal rc and distributary 9 on right bank and construction of rcc retaining wall adjoining project boundaries at trf jammu
Read moreProviding laying jointing testing and commissioning of 1400mm dia rcc heavy duty np4 pipes for interceptor drain of trf project from right bank ds of tawi barrage to existing sewerage network bhagwati nagar chowk jammu
Providing laying jointing testing and commissioning of &#x0d 1400mm dia rcc heavy duty np4 pipes for &#x0d interceptor drain of tawi river front project from right &#x0d bank ds of tawi barrage to existing sewerage network &#x0d bhagwati nagar chowk jammu
Read moreQata construction of grade separator at chharodi junction ch. 27.600 on nh-147 and construction of additional 4 lane bridge over narmada canal and its approaches at km. 22.379 to 22.707 of nh-147 inthe state of gujarat. (job no. 147-gj-2024-25-751)
Qata construction of grade separator at chharodi junction ch. 27.600 on nh-147 and construction of additional 4 lane bridge over narmada canal and its approaches at km. 22.379 to 22.707 of nh-147 inthe state of gujarat. (job no. 147-gj-2024-25-751)
Read moreConstruction of cc lining of asanbani sub minor and rcc retaining wall in heavy filling zone near at rd 660m off taking from rd 10895m of tail minor of right main distributary under deo irrigation project, karanjia for the year 2024-25
Construction of cc lining of asanbani sub minor and rcc retaining wall in heavy filling zone near at rd 660m off taking from rd 10895m of tail minor of right main distributary under deo irrigation project, karanjia for the year 2024-25
Read moreQata construction of grade separator at chharodi junction ch. 27.600 on nh-147 and construction of additional 4 lane bridge over narmada canal and its approaches at km. 22.379 to 22.707 of nh-147 inthe state of gujarat. (job no. 147-gj-2024-25-751)
Qata construction of grade separator at chharodi junction ch. 27.600 on nh-147 and construction of additional 4 lane bridge over narmada canal and its approaches at km. 22.379 to 22.707 of nh-147 inthe state of gujarat. (job no. 147-gj-2024-25-751)
Read moreof your Industry type