Tender Details

Particulars Details
Title
Construction Of 4 Lane Connecting Road Of Tawi Riverfront Development Project And Pre Stressed Concrete Bridge Over Ranbir Canal Rc And Distributary 9 On Right Bank And Construction Of Rcc Retaining Wall Adjoining Project Boundaries At Trf Jammu
Description
Construction Of 4 Lane Connecting Road Of Tawi Riverfront Development Project And Pre Stressed Concrete Bridge Over Ranbir Canal Rc And Distributary 9 On Right Bank And Construction Of Rcc Retaining Wall Adjoining Project Boundaries At Trf Jammu
Organisation Jammu Smart City Limited | State Govt. and UT
Tender Id 2025_SPV_271227_1
Reference
Number
JSCL 170/01 of 2024-25
Tender Fee 15000
EMD 57.39 Lakh
Tender Value
Place Jammu
Link https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=838564
Start Date February 05, 2025 21:30
End Date

26/02/2025 ( Expired 102 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Const of hl bridge single span steel truss 36.00 each eff over sirhind canal xing bhucho kalan to nathana via seema poohli at rd 8.70 km inc appr road diversion dismantling 2.5 m high rcc retaining wall etc pmgsyiii batch i pac no pb02 047

Const of hl bridge single span steel truss 36.00 each eff over sirhind canal xing bhucho kalan&#x0d to nathana via seema poohli at rd 8.70 km inc appr. road diversion dismantling and 2.5 m high rcc retaining wall etc pmgsyiii batch-i pac no pb-02 047 &#x0d

Read more
Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Read more
Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Read more
Construction of rcc retaining wall on left bank from rd19212m to rd19062m and on right bank from rd 18750 to 18800m of supplementary drain.

Construction of rcc retaining wall on left bank from rd19212m to rd19062m and on right bank from rd 18750 to 18800m of supplementary drain.

Read more
Construction of rcc lined canal with retaining wall and rcc solid bridge for bukcle canel chaninage from 7140 m to 7490 m fci godown

Construction of rcc lined canal with retaining wall and rcc solid bridge for bukcle canel chaninage from 7140 m to 7490 m fci godown

Read more
Gt works and material survey for preparation of dpr for construction of a 4 lane major bridge over river bhagirathi,including viaducts,rob interchanges, other major and minor bridges, grade separators, etc connecting kalna of stkk road in west bengal

Gt works and material survey for preparation of dpr for construction of a 4 lane major bridge over river bhagirathi,including viaducts,rob interchanges, other major and minor bridges, grade separators, etc connecting kalna of stkk road in west bengal

Read more
Construction of three foot over bridge on nira left bank canal at ghare bangla and teen mori under baramati municipal corporation tal. baramati, dist. pune.

Construction of three foot over bridge on nira left bank canal at ghare bangla and teen mori under baramati municipal corporation tal. baramati, dist. pune.

Read more
Construction of steel bridge single span 58 m long over bml canal crossing ropar to purkhali via majri jattan fathepur bhangala road in km 1 including its approaches retaining walls and footpath in district rupnagar

Construction of steel bridge single span 58 m long over bml canal crossing ropar to purkhali via majri jattan fathepur bhangala road in km 1 including its approaches retaining walls and footpath in district rupnagar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise