Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constriction Of Divider Paschimi Bypass To Vishungarh Tirah
|
| Description |
Constriction Of Divider Paschimi Bypass To Vishungarh Tirah
|
| Organisation | Directorate of Local Bos UP | State Govt. and UT |
| Tender Id | 2024_DOLBU_970446_2 |
|
Reference Number |
384/30-10-2024 |
| Tender Fee | 2521 |
| EMD | 28300 |
| Tender Value | |
| Place | Npp Chhibramau |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1697326 |
| Start Date | October 31, 2024 23:30 |
| End Date |
Expired
09/11/2024
Expired 589 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bypass from jaitpura to jaisinghpura at sikar road
Construction of bypass from jaitpura to jaisinghpura at sikar road
Read moreConstruction of foot bridge from malik mohalla to parallel bypass, mc kupwara on epc (engineering, procurement and construction)
Construction of foot bridge from malik mohalla to parallel bypass, mc kupwara on epc (engineering, procurement and construction)
Read moreProcurement of mobil pyrotec hfd 46b fire resistant control fluid forhplp bypass osu 2x800 mw ntpc lara
Procurement of mobil pyrotec hfd 46b fire resistant control fluid forhplp bypass osu 2x800 mw ntpc lara
Read moreConstruction of six lane external port connectivity road from the junction of nh 65 and nh 216 to machilipatnam port via machilipatnam bypass section of nh 216 in the state of andhra pradesh
Construction of six lane external port connectivity road from the junction of nh 65 and nh 216 to machilipatnam port via machilipatnam bypass section of nh 216 in the state of andhra pradesh
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of construction of a sixlane external port connectivity road from the junction of nh65 and nh216 to machilipatnam port via machilipatnam bypass section of nh216 in the state of andhra pradesh
Consultancy services for ae for supervision of construction of a sixlane external port connectivity road from the junction of nh65 and nh216 to machilipatnam port via machilipatnam bypass section of nh216 in the state of andhra pradesh
Read moreProvision of auxiliary transformer for interlocking of lc gates of hubli division.
For complete deion and other details, please refer to tender
Read moreSupply and application of a complete of pu sealants
For complete deion and other details, please refer to tender
Read moreMacadamization of road from khurmang to leeran km 3rd to onwards
Macadamization of road from khurmang to leeran km 3rd to onwards
Read moreof your Industry type