Tender Details

Particulars Details
Title
1st Class Brick Lining Work From Chainage (0.00 To 0.380)km With 40 Percent New Brick And Chainage (0.380 To 1.06)km With 100 Percent New Brick, Cement Plaster Both Wall From (0.00 To 0.380)km And Cc Work From (0.00 To 0.380)km At Akaradiya Kala Pum
Description
1st Class Brick Lining Work From Chainage (0.00 To 0.380)km With 40 Percent New Brick And Chainage (0.380 To 1.06)km With 100 Percent New Brick, Cement Plaster Both Wall From (0.00 To 0.380)km And Cc Work From (0.00 To 0.380)km At Akaradiya Kala Pum
Organisation U P Irrigation Department (Mechanical) | State Govt. and UT
Tender Id 2025_UPIDM_1040010_1
Reference
Number
02/EE/MLCD/LKO/ETender/2025-26
Tender Fee 2354
EMD 55700
Tender Value
Place Block Bakshi ka Talab, District Lucknow
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1886104
Start Date May 19, 2025 15:30
End Date

26/05/2025 ( Expired 18 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Urgent mtc. on road from tulabari health sub-centre to chaimarua bazar under killa sub-division pwd(rnb) during the year 2025-26./ s.h. construction of toe wall by cc block pitching, filling, brick soling and allied work etc. (gr-i)

Urgent mtc. on road from tulabari health sub-centre to chaimarua bazar under killa sub-division pwd(rnb) during the year 2025-26./ s.h. construction of toe wall by cc block pitching, filling, brick soling and allied work etc. (gr-i)

Read more

Providing and fixing concertina coil, steel work and brick work to cover vacant quarters to protect from illegal activities in type-i qtrs. from 1209 to 1376 at sector -3,pushp vihar, new delhi dg. 2025-26

Read more
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Read more
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh

Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh

Read more
Construction of new brick drain with rcc slab and cc road ing from the h.o tapan banik to h.o narayan banik near ramthakur asram under ward no. 31, amc

Construction of new brick drain with rcc slab and cc road ing from the h.o tapan banik to h.o narayan banik near ramthakur asram under ward no. 31, amc

Read more
For the boundary wall of gardens etc. located in various wards of the city, the work of digging 2x2 pits and burying 6 feet long cement poles with cc is to be done

For the boundary wall of gardens etc. located in various wards of the city, the work of digging 2x2 pits and burying 6 feet long cement poles with cc is to be done

Read more
Construction of 1st class brick lining in main canal from km. 0.350 to 0.850 km. at korantadeeh pump canal

Construction of 1st class brick lining in main canal from km. 0.350 to 0.850 km. at korantadeeh pump canal

Read more
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,

1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise