First Class Brick Lining From 0.00 To 0420 Km With 40percent New Brick Scattered And 0.420 To 1.30 Km 100percent New Brick Cement Plaster From 0.00 To 1.30 Km And Cc Work From 0.00 To 1.30 Km. And Reparing Of Delivery Tank Along With Construction 33
Description
First Class Brick Lining From 0.00 To 0.420 Km With 40percent New Brick Scattered And 0.420 To 1.30 Km 100percent New Brick Cement Plaster From 0.00 To 1.30 Km And Cc Work From 0.00 To 1.30 Km. And Repairing Of Delivery Tank Along With Construction 3
Organisation U P Irrigation Department (Mechanical) | State Govt. and UT
Tender Id 2025_UPIDM_1001570_1
Reference
Number
03/EE/mlcd/2024-25
Tender Fee 2354
EMD 64000
Tender Value
Place Bhitura Pumap Canal Vikas Khand Haidergard Baraba
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1783683
Start Date February 06, 2025 16:30
End Date

13/02/2025 ( Expired 107 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.

Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.

Read more
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Construction of new covered corridor from main corridor in front of central lab of digital x ray ppp along with connected pathway from digital x ray to emergency nbmc and h in the district of darjeeling.civil work nit/6/25-26

Construction of new covered corridor from main corridor in front of central lab of digital x ray ppp along with connected pathway from digital x ray to emergency nbmc and h in the district of darjeeling.civil work

Read more
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,

1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material

Read more
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Read more
Brick relaying work with new 1st class brick, new brick linning with new 1st class brick, cc on bed with glass strip, cement plaster with all cost of material including labour and tool and plant etc at gokulpur pump canal in district sitapur

Brick relaying work with 40 percent new 1st class brick from chainage (0.010 to 0.200) km new brick linning with 100 percent new 1st class brick from 0.200 km to 0.600 km cc on bed with glass strip from 0.00 km to 0.600 km cement plaster from 0.00 to

Read more
Brick work with 1st class new brick and plaster on wall , brick work with 1st class new bricks, cc work in bed with glass strips , cement pointing and cement plaster on top with all cost of material including labour and tool and plant etc at manikpur

Brick work with 40 percent 1st class new brick and plaster on wall from chainage (0.050 to 0.250) km, brick work with 100 percent 1st class new brick from chainage (0.250 to 0.650) km, cc in bed with glass strips from chainage (0.050 to 0.650)

Read more
Erection of 9 km 33 kv sc line with acsr dog conductor from loharki feeder to 33 kv proposed gss govindsinghpura and const. of 3.15 mva gss at govindisnghpura with 5.9 km 11 kv ic work under aen onm jdvvnl nachana on lrc2022

Erection of 9 km 33 kv sc line with acsr dog conductor from loharki feeder to 33 kv proposed gss govindsinghpura and const. of 3.15 mva gss at govindisnghpura with 5.9 km 11 kv ic work under aen onm jdvvnl nachana on lrc2022

Read more
Maintenance of road from bishalgarh sdm office_karaimura road at jahar saha house to bdv road nehalchandra nagar road at akshay chowmuhani via prabhurampur jb school during the year 2025_26 (l_1point50 km)

Sh_flat brick soling, pot holes repair, wbm iii, carpeting, recarpeting, brick masonry work, cc work and other ancillary works etc portion from 0point50 km to 1point50 km