Tender Details
Particulars | Details |
---|---|
Title |
1st Class Brick For Lining Of Canal With 100 Percent New Brick Alongwith Main Canal Bed From Chainage (0.450 To 1.00) Km With All Cost Of Material, Labour, Tool And Plant Etc As Required As Per Drawing And Boq At Phagoopur Pump Can
|
Description |
1st Class Brick For Lining Of Canal With 100 Percent New Brick Alongwith Main Canal Bed From Chainage (0.450 To 1.00) Km With All Cost Of Material, Labour, Tool And Plant Etc As Required As Per Drawing And Boq At Phagoopur Pump Canal In Raibareli
|
Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2354 |
EMD | 51000 |
Tender Value | |
Place | Phagoopur pump canal in district Raibareli |
Link |
AAAAAAAAAA Login to view |
Start Date | May 21, 2025 15:30 |
End Date |
28/05/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and laying of 570 mtr. mazza ac pipe 300 mm dia class 20 (10 kg/sqm) including all cost of material, labour and tool and plant etc at akaradiya kala pump canal in district lucknow .
Providing and laying of 570 mtr. mazza ac pipe 300 mm dia class 20 (10 kg/sqm) including all cost of material, labour and tool and plant etc at akaradiya kala pump canal in district lucknow .
Read moreFirst class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410)km of pastaur pump canal, raibareli including all cost of material
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material
Read moreBrick work with 1st class new brick and plaster on wall , brick work with 1st class new bricks, cc work in bed with glass strips , cement pointing and cement plaster on top with all cost of material including labour and tool and plant etc at manikpur
Brick work with 40 percent 1st class new brick and plaster on wall from chainage (0.050 to 0.250) km, brick work with 100 percent 1st class new brick from chainage (0.250 to 0.650) km, cc in bed with glass strips from chainage (0.050 to 0.650)
Read moreBrick relaying work with new 1st class brick, new brick linning with new 1st class brick, cc on bed with glass strip, cement plaster with all cost of material including labour and tool and plant etc at gokulpur pump canal in district sitapur
Brick relaying work with 40 percent new 1st class brick from chainage (0.010 to 0.200) km new brick linning with 100 percent new 1st class brick from 0.200 km to 0.600 km cc on bed with glass strip from 0.00 km to 0.600 km cement plaster from 0.00 to
Read more1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of
1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of
Read more1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal in
1st class brick lining work with 60 percent new brick from (0.00 to 0.400) km alongwith cement pointing on both side, top of the walls and cc work in bed with glass strip from (0.00 to 0.400) km and repairing of delivery tank at rudauli pump canal
Read more1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump can
1st class brick for lining of canal with 100 percent new brick alongwith main canal bed from chainage (0.450 to 1.00) km with all cost of material, labour, tool and plant etc as required as per drawing and boq at phagoopur pump canal in raibareli
Read more1st class brick lining work chainage from (0.046 to 0.176)km with 40 percent new brick and (0.220 to 0.500)km with 100 percent new brick and cc work from (0.00 to .500)km in canal be at laxmanpur pump canal, district sitapur
1st class brick lining work chainage from (0.046 to 0.176)km with 40 percent new brick and (0.220 to 0.500)km with 100 percent new brick and cc work from (0.00 to .500)km in canal be at laxmanpur pump canal, district sitapur
Read more1st class brick lining work from chainage (0.00 to 0.380)km with 40 percent new brick and chainage (0.380 to 1.06)km with 100 percent new brick, cement plaster both wall from (0.00 to 0.380)km and cc work from (0.00 to 0.380)km at akaradiya kala pum
1st class brick lining work from chainage (0.00 to 0.380)km with 40 percent new brick and chainage (0.380 to 1.06)km with 100 percent new brick, cement plaster both wall from (0.00 to 0.380)km and cc work from (0.00 to 0.380)km at akaradiya kala pum
Read more1st class brick lining work with 40 percent new brick from chainage (300 to 500)mtr and (700 to 950)mtr and chainage (700 to 950)mtr alongwith cement plaster both wall chainage from (0.0 to 500)mtr, (700 to 950)mtr and 2nd stage chainage (0.0 to 100)
1st class brick lining work with 40 percent new brick from chainage (300 to 500)mtr and (700 to 950)mtr and chainage (700 to 950)mtr alongwith cement plaster both wall chainage from (0.0 to 500)mtr, (700 to 950)mtr and 2nd stage chainage (0.0 to 100)
Read moreof your Industry type