Tender Details
Particulars | Details |
---|---|
Title |
Provision New Sewer Line, New Soak Pit For Disposal Of Sludge From Las And Common Toilets In Csc, Pgmtd Jaipur
|
Description |
Provision New Sewer Line, New Soak Pit For Disposal Of Sludge From Las And Common Toilets In Csc, Pgmtd Jaipur
|
Organisation | Bharat Sanchar Nigam Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 2.37 Lakh |
Tender Value | |
Place | Jaipur |
Link |
AAAAAAAAAA Login to view |
Start Date | May 20, 2025 23:30 |
End Date |
28/05/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreCs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreIndependent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through
Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through
Read moreShort term maintenance contracts from km 308/4 - 309/815, km 312/0 - 316/0 and km 324/4 -328/2 of nh 948 - bangalore -sathyamangalam -coimbatore road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 308/4 - 309/815, km 312/0 - 316/0 and km 324/4 -328/2 of nh 948 - bangalore -sathyamangalam -coimbatore road in the state of tamil nadu for the year 2024-25
Read moreWidening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the
Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type