Tender Details

Particulars Details
Title
Rate Contract For Pulley Lagging Job At Conveyors And Replacement Of Rubber Liners At Wagon Tippler.
Description
Rate Contract For Pulley Lagging Job At Conveyors And Replacement Of Rubber Liners At Wagon Tippler.
Organisation Government of West Bengal
Tender Id 2023_WBPDC_543149_1
Reference
Number
WBPDCL/BKTPP/NIT/E2638/23-24
Tender Fee 0
EMD 27512
Tender Value -
Place The chamber of Sr.Mgr. (CC),BKTPP
Link
View Original Tender Notice

https://wbtenders.gov.in

Start Date July 06, 2023 17:00
End Date
Expired 21/07/2023

Expired 1184 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.

Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.

Read more
Ichp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors

Ichp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors

Read more
Job contract for replacement of top stop assembly including locking gear rack arm and top girder of wagon tippler tp 193 and replacement of spur gear shaft assembly including erection of spur wheel alignment testing and commissioning of wagon tipp

Job contract for replacement of top stop assembly including locking gear rack arm and top girder of wagon tippler tp 193 and replacement of spur gear shaft assembly including erection of spur wheel alignment testing and commissioning of wagon tipp

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Bi-annual rate contract for u4 b and a equipment maintenance,u3-6 btl rectification job, u3 and 4 mill overhauling and gear box replacement job for ktps

Bi-annual rate contract for u4 b and a equipment maintenance,u3-6 btl rectification job, u3 and 4 mill overhauling and gear box replacement job for ktps

Read more
Annual rate contract for pulley lagging job at conveyors and replacement of rubber liners at wagon tippler of chp for a period of 2 years.

Annual rate contract for pulley lagging job at conveyors and replacement of rubber liners at wagon tippler of chp for a period of 2 years.

Read more
Ceramic rubber pulley lagging

Ceramic rubber pulley lagging

Read more
Rubber pads for wagon tippler

Rubber pads for wagon tippler

Read more
Rubber pads of wagon tippler

Rubber pads of wagon tippler

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise