Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rate Contract For Pulley Lagging Job At Conveyors And Replacement Of Rubber Liners At Wagon Tippler.
|
| Description |
Rate Contract For Pulley Lagging Job At Conveyors And Replacement Of Rubber Liners At Wagon Tippler.
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_WBPDC_543149_1 |
|
Reference Number |
WBPDCL/BKTPP/NIT/E2638/23-24 |
| Tender Fee | 0 |
| EMD | 27512 |
| Tender Value | - |
| Place | The chamber of Sr.Mgr. (CC),BKTPP |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | July 06, 2023 17:00 |
| End Date |
Expired
21/07/2023
Expired 1184 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Read moreIchp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors
Ichp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors
Read moreJob contract for replacement of top stop assembly including locking gear rack arm and top girder of wagon tippler tp 193 and replacement of spur gear shaft assembly including erection of spur wheel alignment testing and commissioning of wagon tipp
Job contract for replacement of top stop assembly including locking gear rack arm and top girder of wagon tippler tp 193 and replacement of spur gear shaft assembly including erection of spur wheel alignment testing and commissioning of wagon tipp
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreBi-annual rate contract for u4 b and a equipment maintenance,u3-6 btl rectification job, u3 and 4 mill overhauling and gear box replacement job for ktps
Bi-annual rate contract for u4 b and a equipment maintenance,u3-6 btl rectification job, u3 and 4 mill overhauling and gear box replacement job for ktps
Read moreAnnual rate contract for pulley lagging job at conveyors and replacement of rubber liners at wagon tippler of chp for a period of 2 years.
Annual rate contract for pulley lagging job at conveyors and replacement of rubber liners at wagon tippler of chp for a period of 2 years.
Read moreof your Industry type