Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Rate Contract For Pulley Lagging Job At Conveyors And Replacement Of Rubber Liners At Wagon Tippler Of Chp For A Period Of 2 Years.
|
| Description |
Annual Rate Contract For Pulley Lagging Job At Conveyors And Replacement Of Rubber Liners At Wagon Tippler Of Chp For A Period Of 2 Years.
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_834702_1 |
|
Reference Number |
WBPDCL/BKTPP/NIT/E3685/25-26 |
| Tender Fee | 0 |
| EMD | 29465 |
| Tender Value | - |
| Place | Bakreswar Thermal Power Project |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1861423 |
| Start Date | April 18, 2025 17:00 |
| End Date |
Expired
30/04/2025
Expired 534 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Read moreReconstruction of damaged bearing pedestals of wagon tippler 1 at chp btps
Reconstruction of damaged bearing pedestals of wagon tippler - 1 at chp,ballari themal power station (btps)
Read moreIchp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors
Ichp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors
Read moreRequirement of side pad liners, including specially designed fasteners for wagon tipplers at chp, ssctps, suratgarh
Requirement of side pad liners, including specially designed fasteners for wagon tipplers at chp, ssctps, suratgarh
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreOutsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Read moreOutsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp,sathupally area for a period of 2 years.
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp,sathupally area for a period of 2 years.
Read moreSupply and commissioing of ups with battery for emergency light in underground conveyorsand wagon tippler complex in chp telangana
Supply and commissioing of ups with battery for emergency light in underground conveyorsand wagon tippler complex in chp telangana
Read moreKtps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreBiennial 02 years work contract for operation and maintenance along with housekeeping of coal handling plant chp i 4x210mw and wagon tippler along with alternate coal path and chp ii of 1x500 mw and manual unloading of coal from coal rake at sgtps
Biennial 02 years work contract for operation and maintenance along with housekeeping of coal handling plant chp i 4x210mw and wagon tippler along with alternate coal path and chp ii of 1x500 mw and manual unloading of coal from coal rake at sgtps
Read moreof your Industry type