Tender Details

Particulars Details
Title
Annual Rate Contract For Pulley Lagging Job At Conveyors And Replacement Of Rubber Liners At Wagon Tippler Of Chp For A Period Of 2 Years.
Description
Annual Rate Contract For Pulley Lagging Job At Conveyors And Replacement Of Rubber Liners At Wagon Tippler Of Chp For A Period Of 2 Years.
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id 2025_WBPDC_834702_1
Reference
Number
WBPDCL/BKTPP/NIT/E3685/25-26
Tender Fee 0
EMD 29465
Tender Value -
Place Bakreswar Thermal Power Project
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1861423

Start Date April 18, 2025 17:00
End Date
Expired 30/04/2025

Expired 534 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.

Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.

Read more
Reconstruction of damaged bearing pedestals of wagon tippler 1 at chp btps

Reconstruction of damaged bearing pedestals of wagon tippler - 1 at chp,ballari themal power station (btps)

Read more
Ichp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors

Ichp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors

Read more
Requirement of side pad liners, including specially designed fasteners for wagon tipplers at chp, ssctps, suratgarh

Requirement of side pad liners, including specially designed fasteners for wagon tipplers at chp, ssctps, suratgarh

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years

Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years

Read more
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp,sathupally area for a period of 2 years.

Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp,sathupally area for a period of 2 years.

Read more
Supply and commissioing of ups with battery for emergency light in underground conveyorsand wagon tippler complex in chp telangana

Supply and commissioing of ups with battery for emergency light in underground conveyorsand wagon tippler complex in chp telangana

Read more
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.

Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.

Read more
Biennial 02 years work contract for operation and maintenance along with housekeeping of coal handling plant chp i 4x210mw and wagon tippler along with alternate coal path and chp ii of 1x500 mw and manual unloading of coal from coal rake at sgtps

Biennial 02 years work contract for operation and maintenance along with housekeeping of coal handling plant chp i 4x210mw and wagon tippler along with alternate coal path and chp ii of 1x500 mw and manual unloading of coal from coal rake at sgtps

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise