Tender Details

Particulars Details
Title
Replacement Of Old Damaged 100mm Dia Rcc/Ac Line
Description
Replacement Of Old Damaged 100mm Dia Rcc/Ac Water Supply Line With New 100mm Dia Di Water Supply Line From H.No.10 2 300/24 To H.No.10 2 300/40, Laxmi Nagar To Avoid Low Water Pressure And Polluted Water Supply Complaints Under Vijaynagar Colony Section, Sd Ii, O And M Division Iii
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 115
EMD 3236
Tender Value
Place TS
Link

AAAAAAAAAA

Login to view
Start Date May 24, 2025 00:30
End Date

30/05/2025 ( 0 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line

Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)

Read more
Tower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line

Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route

Read more
Construction of rcc draintotal 8.06 km of nh-512 nh division vii

Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569

Read more
Round the clock routine maintenance alongwith prive, breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/

Round the clock routine maintenance alongwith prive , breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/

Read more
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal

Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Read more
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat

Read more
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b

Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise