Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Old Damaged 100mm Dia Rcc/Ac Line
|
Description |
Replacement Of Old Damaged 100mm Dia Rcc/Ac Water Supply Line With New 100mm Dia Di Water Supply Line At H.No.10 3 911 (B40/F1) To H.No.B46/F1, Labour Adda To Avoid Polluted Water Supply Complaints Under Vijaynagar Colony Section, Sd Ii, O And M Division Iii
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 598696 |
Reference Number |
37/CGM(E)/OMC1/D3/2025-26, Dt.22.05.2025 |
Tender Fee | 91 |
EMD | 2570 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | May 23, 2025 00:30 |
End Date |
29/05/2025 ( Expired 1 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)
Read moreTower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line
Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route
Read moreConstruction of rcc draintotal 8.06 km of nh-512 nh division vii
Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569
Read moreCopper crucible of 350 mm dia. and 3640 mm length for var melting as per drawing- d-4116-03-009a,28
Read more
Round the clock routine maintenance alongwith prive, breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Round the clock routine maintenance alongwith prive , breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreImplementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)