Tender Details

Particulars Details
Title
Periodic Maintenance On Deol To Kiur Road T01 To Gowala Road Km 0/000 To 6/500 Village Road (Sh Providing, Laying And Rolling Premix Carpet Of 20mm Thickness 3/00 To 4/00
Description
Periodic Maintenance On Deol To Kiur Road T01 To Gowala Road Km 0/000 To 6/500 Village Road (Sh Providing, Laying And Rolling Premix Carpet Of 20mm Thickness 3/00 To 4/00
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_101065_1
Reference
Number
17780-880 dated 27.02.2025
Tender Fee 500
EMD 24000
Tender Value
Place Bharmour
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=148701
Start Date March 06, 2025 16:30
End Date

14/03/2025 ( Expired 38 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2

Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2

Read more
Pls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp

Pls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp

Read more
Providing 20mm thick premix carpet on central avenue road (road no.4) from anandpur sahib hydel channel bridge to pro office at nangal township

Providing 20mm thick premix carpet on central avenue road (road no.4) from anandpur sahib hydel channel bridge to pro office at nangal township

Read more
A/r and m/o various road under pwd sub division -3 and 4 of division c and nd-r during 2025-27. (sh - providing service of maintenance vans, thermoplastic paint and kerb stone painting for day to day repair work).

A/r and m/o various road under pwd sub division -3 and 4 of division c and nd-r during 2025-27. (sh - providing service of maintenance vans, thermoplastic paint and kerb stone painting for day to day repair work).

Read more
Maintenance of rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from wadigodri to dhangripimpri km 0 000 to km 30 390 section of nh753h on epc mode in the state of maharashtra package1 risk and

Maintenance of rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from wadigodri to dhangripimpri km 0 000 to km 30 390 section of nh753h on epc mode in the state of maharashtra package1 risk and

Read more
General sabarimala festival 2024 25 upgradation with bm and bc 4 900 km raising the waterlogged portions and providing bm and bc to sa college chakkulam road b w ch 0 000 to 4 900 general civil work

General sabarimala festival 2024 25 upgradation with bm and bc 4 900 km raising the waterlogged portions and providing bm and bc to sa college chakkulam road b w ch 0 000 to 4 900 general civil work

Read more
A/r and m/o on chamunallah to bagshar road km. 0/00 to 3/350 (sh providing and laying built up spray grout in km. 1/00 to 3/350) and a/r and m/o on special repair on shimla mandi via tattapani road km. 55/500 to 90/00(sh providing and laying built u

A/r and m/o on chamunallah to bagshar road km. 0/00 to 3/350 (sh providing and laying built up spray grout in km. 1/00 to 3/350) and a/r and m/o on special repair on shimla mandi via tattapani road km. 55/500 to 90/00(sh providing and laying built u

Read more
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.

Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.

Read more
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district

Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise