Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Day To Day Operation Of 3 Nos Lift 2 No Twenty Passenger Bed Cum Passenger Lift And 1 No Six Passenger Lift At Deben Mahato Government Medical College And Hospital, Purulia
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 38003 |
Tender Value | |
Place | PURULIA |
Link |
AAAAAAAAAA Login to view |
Start Date | May 24, 2025 15:30 |
End Date |
06/06/2025 ( 16 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hiring of 01 nos office vehicles at the office of the medical superintendent cum vice principal malda medical college and hospital
Hiring of 01 nos office vehicles at the office of the medical superintendent cum vice principal malda medical college and hospita
Read moreDesign, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at critical care block in bankura sammilani medical college and hospital of west bengal for 3 years
Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at critical care block in bankura sammilani medical college and hospital of west bengal for 3 years
Read moreSupply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Supply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Read moreSupply, delivery, installation, testing, commissioning with 3 month trial 5 years operation and maintenance of pumping machineries raw water pumping -6 no of pumps each of (1250 cum/hr.) 415v mcc at pump house, power distribution of th
Supply, delivery, installation, testing, commissioning with 3 month trial 5 years operation and maintenance of pumping machineries raw water pumping -6 no of pumps each of (1250 cum/hr.) 415v mcc at pump house, power distribution of th
Read moreProviding comprehensive maintenance and operation of complete hvac system (1328) hp vrv and split acs installed at atal bihari vajpayee govt. medical college and hospital dist- vidisha (m.p.)
Providing comprehensive maintenance and operation of complete hvac system (1328) hp vrv and split acs installed at atal bihari vajpayee govt. medical college and hospital dist- vidisha (m.p.) &#x0d &#x0d
Read moreAAAAAAAAAA
Login to viewDay to day operation of 3 nos lift _2 no twenty passenger bed cum passenger lift and 1 no six passenger lift_ at deben mahato government medical college and hospital, purulia
Read moreMtc. of e.i. in non residential building at chandigarh (providing repair of 2 nos. 8 passenger lift of johnson make installed at transit flats sector 19, chandigarh (1401 to 1408 abc and 1409 to 1416 abc ) (during the year 2025 2026).
Mtc. of e.i. in non residential building at chandigarh (providing repair of 2 nos. 8 passenger lift of johnson make installed at transit flats sector 19, chandigarh (1401 to 1408 abc and 1409 to 1416 abc ) (during the year 2025 2026).
Read moreConstruction of mid day meal cum dinning shed at paschim deogaon sc primary school, paschim deogaon sc (new) pry school, shial danga primary school and sarugaon no 3 bfp school under falakata block
Construction of mid day meal cum dinning shed at paschim deogaon sc primary school, paschim deogaon sc (new) pry school, shial danga primary school and sarugaon no 3 bfp school under falakata block
Read moreDay to day operation of 07 nos. lift installed at main court building of circuit bench of calcutta high court, paharpur, jalpaiguri for the period of 01 year.
Day to day operation of 07 nos. lift installed at main court building of circuit bench of calcutta high court, paharpur, jalpaiguri for the period of 01 year.
Read moreOperation of 1no. 15 passenger lift (make -kone)
Day to day operation of 1no. 15 passenger lift (make -kone) for&#x0d two shifts installed at x-ray block in chittaranjan seva sadan&#x0d cogch, kolkata . (for the period of one year)
Read moreof your Industry type