Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Tm Ii Unit Iv Inspection And Rectification Of Epoxy Cladding Over The Condenser East West Front Side Tube Sheet And Water Box In The Reduced Thickness Area Rebuild The Claddings With Special Epoxy Putties Ie Average 4 5 Mm To Be Built
|
Description |
Ttps Mech Ii Tm Ii Unit Iv Inspection And Rectification Of Epoxy Cladding Over The Condenser East West Front Side Tube Sheet And Water Box In The Reduced Thickness Area Rebuild The Claddings With Special Epoxy Putties Ie Average 4 5 Mm To Be Built
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_345392_1 |
Reference Number |
SE/M-II /TTPS/ No.255/2023-24 |
Tender Fee | 0 |
EMD | 9500 |
Tender Value | |
Place | O/o SE M II / TTPS |
Link | https://tntenders.gov.in |
Start Date | July 17, 2023 23:30 |
End Date |
24/07/2023 ( Expired 638 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm unit ii inspection of condensertubes flaring and torque setting by using special tools tube sheets cleaning degreasing and epoxy coating to the thickness of 1500 microns on condenser tube sheets of the condenser and cleaning sand blasting
Mtps i tm unit ii inspection of condenser tubes flaring and torque setting by using special tools tube sheets cleaning degreasing and epoxy coating to the thickness of 1500 microns on condenser tube sheets of the condenser and cleaning sand blasting
Read moreTtps mechii tm i uniti removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
Ttps mechii tm i uniti removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
Read moreTtps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Read moreTtps mech ii tm i unit iii inspection painting overhauling of condenser cw pipelines hotwells etc during annual overhaul 2024 2025
Ttps mech ii tm i unit iii inspection painting overhauling of condenser cw pipelines hotwells etc during annual overhaul 2024 2025
Read moreTtps mech ii tm i unit iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during annual overhaul
Ttps mech ii tm i unit iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning during annual overhaul
Read moreTtps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2024 2025
Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2024 2025
Read moreTtps mech ii tm i unit ii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
Ttps mech ii tm i unit ii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mate
Read moreTtps mech ii tm i unit i removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mater
Ttps mech ii tm i unit i removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mater
Read moreTtps mech ii tm ii inspection and reconditioning of vent condenser shell in unit iv
Ttps mech ii tm ii inspection and reconditioning of vent condenser shell in unit iv
Read moreTtps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built
Ttps mech ii tm ii unit iv inspection and rectification of epoxy cladding over the condenser east west front side tube sheet and water box in the reduced thickness area rebuild the claddings with special epoxy putties ie average 4 5 mm to be built
Read moreof your Industry type