Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation Of Bowli With Bathroom At Jandhar W.No. 2 Bowli At Khandray
|
| Description |
Renovation Of Bowli With Bathroom At Jandhar W.No. 2 Bowli At Khandray
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_224914_67 |
|
Reference Number |
e-NIT No.79 /REW/K of 2023-24 Dated 04/08/2023 |
| Tender Fee | 500 |
| EMD | 3600 |
| Tender Value | - |
| Place | kathua |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | August 07, 2023 23:30 |
| End Date |
Expired
14/08/2023
Expired 1116 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fencing work with concertina coil/wire & barricading of transformer & dg set in ebc/obc 520 bedded for girl's resendential +2 high school at silao nalanda, & mokar rohtas & 100 bedded boys hostel at devisarai nalanda, 100 bedded hostel at mahdah, buxar, bihar.
Fencing work with concertina coil/wire & barricading of transformer & dg set in ebc/obc 520 bedded for girl's resendential +2 high school at silao nalanda, & mokar rohtas & 100 bedded boys hostel at devisarai nalanda, 100 bedded hostel at mahdah, buxar, bihar.
Read moreRepair work, renovation of toilets, and construction of the boundary wall at the obc hostel, ramadhin college, sheikhpura for the year 2026–27.
Repair work, renovation of toilets, and construction of the boundary wall at the obc hostel, ramadhin college, sheikhpura for the year 2026–27.
Read moreSupply and replacement of position indicators for seven radial gates at bp dam along with rectification floating shaft bevel gear assembly of gate no 2 and 5.
Supply and replacement of position indicators for seven radial gates at bp dam along with rectification floating shaft bevel gear assembly of gate no 2 and 5- scope of work as per tender document.
Read moreSupply of 27hp tractor with accessories for green campus development at cutn
Supply of 27hp tractor with accessories for green campus development at cutn
Read moreRenovation to e/w & e/i of conference hall, campus lighting as well as provision of sitc of split type ac at subdivisional office, teghra, distt.-begusarai.
Renovation to e/w & e/i of conference hall, campus lighting as well as provision of sitc of split type ac at subdivisional office, teghra, distt.-begusarai.
Read moreConstruction of 720 bedded dr. bhim rao ambedkar sc/st residential school (10+2) at ramchak chapra (saran).
Construction of 720 bedded dr. bhim rao ambedkar sc/st residential school (10+2) at ramchak chapra (saran).
Read moreSupply and installation of new yonex mat (ac 364) in two badminton courts at badminton hall 2 in iitg campus
Supply and installation of new yonex mat (ac 364) in two badminton courts at badminton hall 2 in iitg campus
Read moreConstruction of streets with pre-cast drain and interlocking paver blocks in old usmanpur village at ghonda ac-66.
Construction of streets with pre-cast drain and interlocking paver blocks in old usmanpur village at ghonda ac-66.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreof your Industry type