Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation Of Bowli With Bathroom At Jandhar W.No. 2 Bowli At Khandray
|
| Description |
Renovation Of Bowli With Bathroom At Jandhar W.No. 2 Bowli At Khandray
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_220413_30 |
|
Reference Number |
e-NIT No.51 /REW/K of 2023-24 Dated 08/07/2023 |
| Tender Fee | 500 |
| EMD | 3600 |
| Tender Value | - |
| Place | KATHUA |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | July 08, 2023 23:30 |
| End Date |
Expired
14/07/2023
Expired 1176 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreRenovation of bowli with bathroom at jandhar w.no. 2 bowli at khandray
Renovation of bowli with bathroom at jandhar w.no. 2 bowli at khandray
Read moreConst. of bowli with prot. bathroom at moh. satpal at w.no.04
Const. of bowli with prot. bathroom at moh. satpal at w.no.04
Read moreConstt. of bowli with bathroom at changroo wno 2
Constt. of bowli with bathroom at changroo wno 2
Read moreConst of bathroom with improvement of bowli and allied work at kulsal at w.no.2 imp of bowli at upper at w.no.9 and imp of bowli and bathroom with allied work pattin at w.no.9 pyt- pathi under capex pri for the year 2023-24
Boq
Read moreRepair of pond at chintpurni w.no. 03 (2) constt of bowli with slab and bathroom at sui nallah w.no.02 pyt. makwal
Repair of pond at chintpurni w.no. 03 (2) constt of bowli with slab and bathroom at sui nallah w.no.02 pyt. makwal
Read moreRepair of pond at chintpurni w.no. 03 (2) constt of bowli with slab and bathroom at sui nallah w.no.02 pyt. makwal
Repair of pond at chintpurni w.no. 03 (2) constt of bowli with slab and bathroom at sui nallah w.no.02 pyt. makwal
Read moreof your Industry type