Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Work Of Of Four Lane Road Late Shrimant Madahav Rao Scindia Statue Shatabdipuram To Villgae Bhadroli Road Length 4.00 Km (Including Electric Pole Shifting)
|
| Description |
Construction Work Of Of Four Lane Road Late Shrimant Madahav Rao Scindia Statue Shatabdipuram To Villgae Bhadroli Road Length 4.00 Km (Including Electric Pole Shifting)
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_291766_1 |
|
Reference Number |
26/SAC/D1GWL/2023-24 |
| Tender Fee | 30000 |
| EMD | 10 Lakh |
| Tender Value | |
| Place | CE PWD NORTH ZONE GWALIOR |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | July 17, 2023 16:00 |
| End Date |
Expired
04/08/2023
Expired 1051 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreConstruction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConstruction of ratikhedi to ranikhedi via bhatpipliya, katkya road length 4.00 km including electric pole shifting and hight rising work.
Construction of ratikhedi to ranikhedi via bhatpipliya, katkya road length 4.00 km including electric pole shifting and hight rising work.
Read moreConstruction of madiyan to bahrasar road with utility pole shifting length 4.00 km
Construction of madiyan to bahrasar road with utility pole shifting length 4.00 km
Read moreConstruction of barkhedadev dungari to changri via 4 line neemuch road length 4.00 km including electric pole shifting and hight rising work
Construction of barkhedadev dungari to changri via 4 line neemuch road length 4.00 km including electric pole shifting and hight rising work
Read moreConstruction work of katangi ghansa tekepar road length-3.00 km (pole shifting including electric work)
Construction work of katangi ghansa tekepar road length-3.00 km (pole shifting including electric work)
Read moreConstruction of laxmipur to amhai road length 1.70 km including electric pole shifting
Construction of laxmipur to amhai road length 1.70 km including electric pole shifting
Read moreof your Industry type