Tender Details

Particulars Details
Title
Ie Services For Construction Of 4 Lane Bypass To Nh114 A Connecting Nh 333 And Nh 133(deoghar Bypass) From Design Km 0.000 To Design Km 49.000 Total Length 49.000 Km In Jharkhand On Ham
Description
Ie Services For Construction Of 4 Lane Bypass To Nh114 A Connecting Nh 333 And Nh 133(deoghar Bypass) From Design Km 0.000 To Design Km 49.000 Total Length 49.000 Km In Jharkhand On Ham
Organisation Central Public Procurement Portal 2
Tender Id 2023_NHAI_151115_1
Reference
Number
NHAI/11012/JH/IE/ Deoghar-Bypass/2022-23
Tender Fee 5000
EMD 0
Tender Value 0
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in

Start Date April 06, 2023 19:30
End Date
Expired 13/11/2023

Expired 1065 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o

Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o

Read more
Ie services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km

Ie services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Cs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode

Cs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode

Read more
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.

Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.

Read more
Const of 4/6l gf ludhiana rupnagar nh 205k from jn with ne to manewal (ludhiana) to jn with nh205 near bheora (rupnagar) with ludhiana bypass under nh(o) in punjab on ham pkg 2 dc 37.700 to 66.440 and ludhiana bypass dc. 0.000 to 18.500 tl 47.240 km

Const of 4/6l gf ludhiana rupnagar nh 205k from jn with ne to manewal (ludhiana) to jn with nh205 near bheora (rupnagar) with ludhiana bypass under nh(o) in punjab on ham pkg 2 dc 37.700 to 66.440 and ludhiana bypass dc. 0.000 to 18.500 tl 47.240 km

Read more
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

Read more
Consultancy services for authority s engineer for supervision of construction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 135.796 of nh-234 (km 75.150 of new nh-38) and ending at design km 158.506 of nh-234(km 88

Consultancy services for authority s engineer for supervision of construction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 135.796 of nh-234 (km 75.150 of new nh-38) and ending at design km 158.506 of nh-234(km 88

Read more
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode

Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode

Read more
Develop. of 6l ac gf regional expressway on northern side of hyderabad from pragnapur vill design ch82.000 to tangad palle vill design ch160.000 for a design l of 78.000 km in the state of telangana under nh(o) on ham pkgii

Develop. of 6l ac gf regional expressway on northern side of hyderabad from pragnapur vill design ch82.000 to tangad palle vill design ch160.000 for a design l of 78.000 km in the state of telangana under nh(o) on ham pkgii

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise