Tender Details

Particulars Details
Title
Difference Type Of Work In Business Plan 2024 25 In The Area Of Edd Iii Bulandhshar.
Description
Difference Type Of Work In Business Plan 2024 25 In The Area Of Edd Iii Bulandhshar.
Organisation Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT
Tender Id 2024_PVVNL_925822_1
Reference
Number
10/EDC-III/B/2024-2025
Tender Fee 3540
EMD 19000
Tender Value
Place BULANDSHAHR
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1629794
Start Date July 29, 2024 22:30
End Date

05/08/2024 ( Expired 291 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Design, construction,supply, installation and commissioning of package type sewage treatment plant (based on mbr technology) within power plant area of bokaro thermal power station on epc basis

Design, construction,supply, installation and commissioning of package type sewage treatment plant (based on mbr technology) within power plant area of bokaro thermal power station on epc basis

Read more
Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)

Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)

Read more
4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)

4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise