Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Of The Connection Road From Km 12 Of J.G.A.P Road To Babupur Durgaganj And Hargaon Via Alpsingh Via Bakhtawar To Revdapur (Chainage 0.00 To 0.400 And Budhebaba Mandir To Hargaon Mode (Chainage 0.00 To 0.400)
|
| Description |
Widening And Strengthening Of The Connection Road From Km 12 Of J.G.A.P Road To Babupur Durgaganj And Hargaon Via Alpsingh Via Bakhtawar To Revdapur (Chainage 0.00 To 0.400 And Budhebaba Mandir To Hargaon Mode (Chainage 0.00 To 0.400)
|
| Organisation | Chief Engineer PWD Faizabad Zone | State Govt. and UT |
| Tender Id | 2024_CEUFZ_896178_1 |
|
Reference Number |
196/1Com-Sul.Amethi Circle/2023-24 Date 23-01-2024 |
| Tender Fee | 2714 |
| EMD | 9.5 Lakh |
| Tender Value | - |
| Place | AMETHI |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1540807 |
| Start Date | February 16, 2024 14:30 |
| End Date |
Expired
22/02/2024
Expired 967 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Special repair of j.g.a.p. road ke km 12 se babupur durgaganj evam hargaon pure alph singh via pure bakhtawar hote huye rewdhapur link road
Special repair of j.g.a.p. road ke km 12 se babupur durgaganj evam hargaon pure alph singh via pure bakhtawar hote huye rewdhapur link road
Read moreSpecial repair of j.g.a.p. road ke km 12 se babupur durgaganj evam hargaon pure alph singh via pure bakhtawar hote huye rewdhapur link road
Special repair of j.g.a.p. road ke km 12 se babupur durgaganj evam hargaon pure alph singh via pure bakhtawar hote huye rewdhapur link road
Read moreConstruction of link road from hastpur- pipali road to bhamraula via ranihal u.m.s. aligarh . (chainage 0.00-1.00 km).
Construction of link road from hastpur- pipali road to bhamraula via ranihal u.m.s. aligarh . (chainage 0.00-1.00 km).
Read moreConstruction of migging tutting road km 0.00 to km 19.834 design chainage under 1448 bcc 761 brtf p brahmank in epc mode
Construction of migging tutting road from cl-9 to nhdl specification km 0.00 to km 19.834 design chainage under 1448 bcc 761 brtf p brahmank in epc mode
Read moreWidening and strengthening work of mohanganj fursatganj road via peedhi road via dharmedham to janapur road (odr) in amethi district (from chainage 0.00 to 3.00 km)
Widening and strengthening work of mohanganj fursatganj road via peedhi road via dharmedham to janapur road (odr) in amethi district (from chainage 0.00 to 3.00 km)
Read moreConstruction of ditte-dime-migging road km 0.00 to 29.936 design chainage under 105 rcc 761 brtf p brahamank in epc mode pkg i
Construction improvement of ditte dime migging road design chainage km 0.00 to km 29.936 from class 9 to nhdl spcn under 105 rcc 761 brtf p brahmank in the state of arunachal pradesh pkg i under epc mode
Read moreRepair maintenance strengthening of existing approach road from barwala lakhwar road to surge shaft chainage 0.00-930.00m and internal road from guard room to bl road via hathiari sub station chainage 0.0-300m of vyasihep 2x60mw at hathiyari dehradun
Repair maintenance strengthening of existing approach road from barwala lakhwar road to surge shaft chainage 0.00-930.00m and internal road from guard room to bl road via hathiari sub station chainage 0.0-300m of vyasihep 2x60mw at hathiyari dehradun
Read moreWidening to 4 lane with paved shoulder configuration of vodarevu chilakaluripet section design chainage 0.00 to 47.000 of nh 167a package-i on epc mode in the state of andhra pradesh under annual plan 2022 23
Widening to 4 lane with paved shoulder configuration of vodarevu chilakaluripet section design chainage 0.00 to 47.000 of nh 167a package-i on epc mode in the state of andhra pradesh under annual plan 2022 23
Read moreFdr / repairing of road from kbk-jtb road to chalagang via nabojoy para during the year 2023 -24. / sh- grouting, flat brick soling and unlined surface drain etc. at chainage 0.00 km to 6.00 km.
Fdr / repairing of road from kbk-jtb road to chalagang via nabojoy para during the year 2023 -24. / sh- grouting, flat brick soling and unlined surface drain etc. at chainage 0.00 km to 6.00 km.
Read moreWidening to two lane with paved shoulder of chintoor to motu section of nh326 from km 0.00 to km9.600 design chainage km0.00 to km 8.345 in the state of andhra pradesh on epc mode under annual plan 2022 23
Widening to two lane with paved shoulder of chintoor to motu section of nh326 from km 0.00 to km9.600 design chainage km0.00 to km 8.345 in the state of andhra pradesh on epc mode under annual plan 2022 23
Read moreof your Industry type